Laserfiche WebLink
Page 7. <br />owns and maintains the 69 kV power line running east west through the portal area <br />and the 14.470 kV power line adjacent to Hwy 12. The ownership of these power <br />lines is indicated on the map. The power lines owned by NECC are listed in Table <br />19 and labeled on Map 11- New Elk Mine Site Plan East Portal Sheet 1- Roads, <br />Slope Track, and Cut Areas and Map 12 - Surface Facilities and Roads - West <br />Portal. Permit page 2.05-5c has been revised to more clearly describe the <br />ownership. <br />If you require any further information please contact me. <br />Sincerely, <br />Ronald Thom son <br />Mine Superintendent <br />Enclosures: <br />Permit Pages 2.05-5, 5a, 5c, 6, 6a, 7, 10,10a, 11, 46, 46a, 46b, 46c <br />Map 11 New Elk Mine Site Portal <br />Sheet 1 - East Portal Roads, Slope Track and Cut Areas <br />Sheet 2 - East Portal Utilities <br />Sheet 3 - East Portal Facilities <br />Exhibit 28 pages 129, 144, 147, 150, 153