Laserfiche WebLink
NEW ELK COAL <br />COMPANY <br /> <br />December 14, 2010 <br />Mr. Kent Gorham <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: New Elk Mine (Permit No. C-1981-012) <br />Technical Revision No. 54 (TR-54) <br />Surface Facilities <br />Dear Mr. Gorham: <br />WVr- <br />DEC 15 ZD10 <br />Please find the response to the adequacy issues for TR54 dated December 3, <br />2010. Only those items that have not been accepted by DRMS are addressed <br />with this letter. The item numbers are consistent with the DRMS adequacy <br />review. <br />2. Rule 2.05.3(3) (c) requires a description of each road conveyor or <br />rail system to be constructed used or maintained within the proposed <br />permit area. The description shall include a map prepared in <br />accordance with 2.10 appropriate cross sections and the following <br />specifications for each road width, road gradient, road surface, road <br />cut, fill, embankment, culvert, bridge, drainage ditch, and drainage <br />structure. Please submit the required information as permit text <br />narrative along with the required cross sections for all roads or rail <br />systems proposed to be added under this revision. <br />122 W. First Street PHONE (719) 845-0090 <br />Trinidad, CO 81082 FAX ((719) 845-0077 <br />E-MAIL ronthompson@newelkcoal.com