Laserfiche WebLink
amecs <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture-Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue anchor trench backfill. <br />Continue installation of the high volume solution collection system. <br />Continue DCF placement. <br />Continue loading ore at the Phase 5 PSSA <br />Finish construction of level indicator piping <br />Summary of Non-conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V.• <br />CC&V held a Weekly Construction meeting on November 9, 2010. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />AMEC: <br />None <br />Others: <br />None <br />Summary of Incidents/Accidents/Health & Safety Issues: <br />None <br />We trust the information provided clearly represents our findings and observations for the week ending <br />November 13, 2010. <br />Joseph D. Hickey, CQA Monitor <br />Approved By:?? _ <br />Date: November 13, 2010 <br />Date: t-L 6' - Z,61 V <br />VLF Weekly Report WE 11.