My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-07_ENFORCEMENT - M2001085
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M2001085
>
2010-12-07_ENFORCEMENT - M2001085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:38 PM
Creation date
12/15/2010 7:05:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001085
IBM Index Class Name
ENFORCEMENT
Doc Date
12/7/2010
Doc Name
Consent Agenda Summary Form
From
DRMS
To
Mr. Les Ewegen
Email Name
DB2
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 3 <br />REASON FOR VIOLATION: <br />The Operator has placed overburden mined from the pit onto land that is outside ofthe permit area. <br />STAF F RF.COA7i1r1ENDAT1011j- <br />Violation: <br />Find a violation of §34-32.5-116(4)(i) C.R.S. for failure to protect areas outside of the affected <br />land from slides or damage occurring during the mining operation, <br />and <br />find a violation of §34-32.5-116(4)0) C.R.S. for failure to stabilize and protect all surface areas <br />of the affected land, including spoil piles, so as to effectively control erosion. <br />Cease and Desist Order: <br />Issue a Cease and Desist Order prohibiting any further mining-related activities on the unpermitted <br />portions of the site, except for those activities required to pre; Cnt damage to o11-site areas or to <br />protect human health, property, or the environment until the Operator complies with the Board <br />Order. <br />Corrective Action(s): <br />Require the Operator to submit a 112 Construction Materials Amendment Application that will <br />expand the permitted area to include the newly disturbed area. <br />The Amendment application shall be submitted by 1 March 2011. <br />Civil Penalty: <br />For violations of §34-32.5-116(4)(1) and 0) C.R.S. a Civil Penalty may be assessed at a rate of <br />WOW $1,000 for each day of violation. In this case, there are 44 days of violation (from the date <br />of inspection on 4 October 2010 to the initially scheduled Board Meeting date of 17 November <br />2010). <br />The Division could assess a civil penalty of $100 to $1,000 per day of violation for 44 days for a <br />civil penalty amount of between $4,400 and $44,000. In this matter, the Division assesses a civil <br />penalty of $10,000 with all but $1,000 suspended if the Operator complies with the corrective <br />action. <br />Payment of the un-suspended portion of the civil penalties (51,000) is due within 30 days of the <br />signature date of the Board Order.
The URL can be used to link to this page
Your browser does not support the video tag.