My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-13_REVISION - C2009087
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2010-12-13_REVISION - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:52 PM
Creation date
12/14/2010 8:45:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
REVISION
Doc Date
12/13/2010
Doc Name
Letter, Application and Public Notice
From
Sage Creek Coal Company, LLC
To
DRMS
Type & Sequence
TR1
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUMMARY OF REVISIONS/ADDITIONS <br />INSERTION INSTRUCTIONS <br />Sage Creek Coal Company <br />Peabody Sage Creek Mine (C-2009-087) <br />Technical Revision TRO1-10 <br />December 2010 <br />Vol 1A - Rule 2.05.2 <br />• Operation Plan - Est. Area for Life of Operation ..........replace entire text section <br />Vol 1A - Rule 2.05.3 <br />• Operation Plan - Permit Area ....................................... replace entire text section <br />Vol. 3A - Exhibit 2.05.3-E2 <br />• Drainage and Sediment Control Plan ............................replace entire text section <br />• Appendix 2.05.3-E2.A, Addendum 2.05.3-E2.A-1 <br />10-yr, 24-hr SEDCAD Demonstration ...........................replace entire section <br />• Appendix 2.05.3-E2.A, Addendum 2.05.3-E2.A-2 <br />25-yr, 24-hr SEDCAD Demonstration ...........................replace entire section <br />• Appendix 2.05.3-E2.D, Addendum 2.0.53-E2.D-3 <br />Combination Spillway Channel Design ......................... remove addendum D-3 <br />Vol. 3B - Exhibit 2.05.3-E2 <br />• Appendix 2.05.3-E2.E, <br />Coal Stockpile Sump Design Report .............................. replace with attached E2-E, <br />Sump Design Report <br />• Appendix 2.05.3-E2.G-2, South Facilities Area <br />Operational Ditch and Culvert Designs ..........................replace entire section <br />Vol. 3C - Exhibit 2.05.3-E2 <br />• Map 2.05.3-E2.D, PECOCO Pond <br />Spillway Redesign .........................................................replace with Upper Sump <br />Design Map <br />• Map 2.05.3-E2.E, Coal Stock Pile Sumps ......................replace with Lower Sump <br />Design Map
The URL can be used to link to this page
Your browser does not support the video tag.