Laserfiche WebLink
(d) Remove temporary or large siltation structures from <br />drainage ways after disturbed area are revegetated and <br />stabilized, if required by the Reclamation Plan: <br />No temporary or large siltation structures are anticipated within <br />associated drainageways. <br />(2) Earthen dams, if necessary to impound water, may be <br />constructed if the formation of such impoundments will not damage <br />adjoining property or conflict with water pollution laws, rules or <br />regulations of the federal government, the State of Colorado or with <br />any local government pollution ordinances: <br />No earthen dams are proposed for the expansion areas as part of the <br />mining or reclamation plan. There is the potential for one or two stock <br />water tanks to be constructed on the reclaimed area as part of the post <br />mining land use, if so requested by HRLP. If the HRLP makes such a <br />request, the Operator will file a Technical Revision prior to final site <br />reclamation with the DRMS. <br />(3) All surface areas of the affected land, including spoil piles shall <br />be stabilized and protected so as to effectively control erosion: <br />All surface areas of the affected land, including spoil piles, will be <br />stabilized and protected so as to effectively control erosion. (Please see <br />Section 3.1.5 (10) above) <br />The main access roads on the Bettger Pit will be left if requested by the <br />landowner. <br />3.1.7 Ground Water - Specific Requirements: <br />Ground water is discussed in Exhibit "9'- Water Information. <br />3.1.8 Wildlife: <br />(1) All aspects of the mining and reclamation plan shall take into <br />account the safety and protection of wildlife on the mine site, and all <br />associated facilities with special attention given to critical periods for <br />wildlife: <br />No change from the approved Bettger Pit Permit. <br />• <br />19