My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-10_REVISION - M1976051
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1976051
>
2010-12-10_REVISION - M1976051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:45:56 PM
Creation date
12/13/2010 10:33:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976051
IBM Index Class Name
REVISION
Doc Date
12/10/2010
Doc Name
112c amendment application AM-05
From
Duckels Construction, Inc.
To
DRMS
Type & Sequence
AM5
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(9) Placement of inert structural fill imported from off-site: <br />At this time the Operator only intends to import inert fill from <br />its Hogue River Pit. If such material is imported from other locations, the <br />Operator will comply with the provision of Section 3.1.5(9) of the <br />Division's and Mined Land Reclamation Board's regulation. <br />(10) All mined material to be disposed of within the affected area must <br />be handled in such a manner so as to prevent any unauthorized <br />release of pollutants to the surface drainage system: <br />All mined material will be handled in such a manner so as to prevent any <br />unauthorized release of pollutants to the surface drainage system. All <br />stockpiled material will be located and managed so as to avoid any <br />uncontrolled runoff. All storm water runoff from the site will be in <br />accordance with its Stormwater Management Plan. (A Stormwater Permit <br />is only required where an operation has the possibility of a discharge to <br />state waters from storm water that can come into contact with any <br />overburden, raw materials, intermediate products, finished products, by <br />products or waste products located at the site of such operations.) The <br />Operator intends to operate the site such that storm water will either be <br />prevented from contacting the above listed items; or where it does come <br />into contact with any of the above listed items, it will not be discharged <br />from the site. Regardless, the Operator holds a Stormwater Discharge <br />Permit for the Operation. In addition, the existing Stormwater <br />Management Plan will be revised as needed. <br />(11) No unauthorized release of pollutants to ground water shall occur <br />from any materials mined, handled or disposed of within the permit <br />area: <br />No ground water pollutants shall be released from the site. Fuel storage, <br />sufficient for on-site operations, occurs off site at the Operators main <br />Office several miles east of the Operation. A fuel truck will be brought <br />on-site for equipment fuel and lubrication as needed. The operator has a <br />Spill Prevention, Containment and Countermeasures (SPCC) Plan in <br />place. <br />E-1 <br />17
The URL can be used to link to this page
Your browser does not support the video tag.