My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-01_HYDROLOGY - M1982131
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1982131
>
2010-12-01_HYDROLOGY - M1982131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:23 PM
Creation date
12/1/2010 10:53:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982131
IBM Index Class Name
HYDROLOGY
Doc Date
12/1/2010
Doc Name
Substitute Water Supply Plan
From
OSE
To
Applegate Group, Inc.
Permit Index Doc Type
Hydrology Report
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Table No. 3 <br />Bucklen Equipment Company, Inc. <br />Bucklen Pit (M-1982-131) <br />WY 2011 Estimated GIC Subsurface Return Flow Obligations <br />Applegate <br />Group, h.. <br />'Ji", Date Revised: 9/30/2010 <br />AG Job ii: 08-127 <br />. <br />?F ti ,a ( <br />4 ' <br /> <br />w, <br />k'', 71C?L)If2 ct Flo ` x <br />k vs e2NO r ??t <br />-Fossil Creek R r <br />3 WY 201 ? ; "GIC Direct GIC Direet;?- Fossil°C°reeks ' fto ' <br /> Subsurface::, Subsurface± Subsurface utisu ee <br />## - <br />RetuHn Flow <br />f Rf ObligaUOr `t rl Figwu i ' d "o <br /> <br />t w' r <br />, <br />i <br />actor?'r <br />Yi F L r <br />` <br />' z ,' [ac ftJ <br />a o t <br />?F , a. <br /> <br />o ? <br />Sal ? <br />° <br />,_ M <br />nth elQ ilvr <br />r <br />(B) <br />a <br />4 <br />November 2.1% 1.05 2.0% 0.00 <br />December 2.0% 1.00 1.8% 0.00 <br />January 1.8% 0.90 1.7% 0.00 <br />February 1.7% 0.85 1.6% 0.00 <br />March 1.6% 0.80 1.5% 0.00 <br />April 1.5% 0.75 1.4% 0.00 <br />May 1.8% 0.90 1.3% 0.00 <br />June 2.1% 1.05 1.2% 0.00 <br />July 2.3% 1.15 1.5% 0.00 <br />August 2.4% 1.20 2.4% 0.00 <br />September 2.4% 1.20 2.5% 0.00 <br />October 2.3% 1.15 2.1% 0.00 <br />Total 24.0% 11.96 21.0% 0.00 <br />W <br />t <br />Y Total Annual Delivery [ac-ft] R <br />k <br />a <br />er <br />ear <br />GIC Direct Flow <br />Fossil Creek Reservoir emar <br />s <br />2009 <br />2010 45.82 <br />53.81 0.00 <br />0.00 From District 3 Water Commissioner Accounting <br />Based on actual and projected deliveries <br />Average 49.82 0.00 <br />Notes: <br />(A) Monthly subsurface return flow factors per Poudre Prairie Decree <br />(B) Equals Column (A) multiplied by the average total annual delivery of GIC direct flow water <br />(C) Monthly subsurface return flow factors per Poudre Prairie Decree <br />(D) Equals Column (C) multiplied by the average total annual delivery of Fossil Creek Reservoir water <br />Red italics denotes <br />projection based on svgs <br />WY 2010 <br />GIC Direct <br />Deliveries <br />[ac-ft] WY 2010 <br />Fossil Creek <br />Deliveries <br />[ac-ft] <br />0.00 0.00 <br />0.00 0.00 <br />0.00 0.00 <br />0.00 0.00 <br />0.00 0.00 <br />1.44 0.00 <br />0.00 0.00 <br />1.65 0.00 <br />17.24 0.00 <br />15.48 0.00 <br />10.87 0.00 <br />7.14 0.00 <br />53.81 0.00 <br />N:\08127 Bucklen Pit Augmentation\Disciplines (Technical)\Water Rights\SWSP\WY 2011\Bucklen Pit 2011 SWSP.xlsx
The URL can be used to link to this page
Your browser does not support the video tag.