Laserfiche WebLink
Table No. 2 <br />Bucklen Equipment Company, Inc. <br />Bucklen Pit (M-1982-131) <br />Operational Consumptive Use (aka Operation CU) <br />From Mining <br />Applegate <br />Group, inn. <br />Date Revised: 9/15/2010 <br />AG Job #: 08-127 <br />Month Percent of, <br />Annual' <br />Production <br />(A Monthly,,, <br />Production <br />[tons] : <br />(B)' Water Retained <br />in Product <br />[ac-ftj <br />(C), Water Used;_ <br />"for Dust'Control <br />f [ac=ft] <br />(D) Operation. - <br />CU;, <br />' [ac-ff] <br /> <br />)` ' <br />E <br />November 7% 3,500 0.05 0.00 0.05 <br />December 6% 3,000 0.04 0.00 0.04 <br />January 9% 4,500 0.07 0.00 0.07 <br />February 5% 2,500 0.04 0.00 0.04 <br />March 6% 3,000 0.04 0.57 0.61 <br />April 10% 5,000 0.07 0.55 0.63 <br />May 12% 6,000 0.09 0.57 0.66 <br />June 8% 4,000 0.06 0.55 0.61 <br />July 10% 5,000 0.07 0.57 0.64 <br />August 14% 7,000 0.10 0.57 0.67 <br />September 6% 3,000 0.04 0.55 0.60 <br />October 7% 3,500 0.05 0.57 0.62 <br />Total 100% 50,000 0.74 4.51 5.25 <br />Total Annual Production = 501000 tons (estimated by Operator) <br />Moisture Content of Product = 2% by weight <br />Water Used for Dust Control = 6,000 gallons per day during March through October <br />Notes: <br />(A) Estimated monthly production percentages. Provided by Bucklen Equipment Company <br />(B) Monthly Production = (Total Annual Production) * (A) <br />(C) Water Retained in Product = [(Moisture Content of Product) * (B) * 2000] / (62.4 * 43560) <br />(D) Water Used for Dust Control is estimated to be 6000 gallons per day during March through October <br />(E) Operation CU = (C) + (D) <br />N:\08127 Bucklen Pit Augmentation\Disciplines (Technical)\Water Rights\SWSP\WY 2011\Bucklen Pit 2011 <br />SWSP.xlsx