My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (181)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (181)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:27 PM
Creation date
12/1/2010 6:47:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL.1 Cover & table of contents
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ameo <br />testing. When trial seams did not meet specifications, AMEC verified that the welding <br />apparatus was not used until two consecutive trial seams performed by the same <br />technician/apparatus combination met specifications. The trial seam test results for <br />extrusion and fusion seaming are presented in Appendix K-2 and L-2 for the secondary and <br />primary geomembranes, respectively. Lone Star used one tensiometer during the project. <br />Tensiometer certifications are presented in Appendix N. Figures 3 and 4 show the codes <br />used to designate passing and failing test results. <br />6.2.3.2 Seaming Observations <br />AMEC personnel observed seams before, during and after welding. AMEC checked each <br />seam for adequate overlap prior to seaming and to verify that the seam area was clean and <br />dry. <br />AMEC documented Lone Star personnel performing the seaming and the seaming <br />equipment used. Following the completion of seaming and routine repairs, AMEC checked <br />the full length of each seam to verify that no additional repairs were required. In the event <br />that additional repairs were needed, AMEC marked the location requiring repair on the <br />geomembrane, documented the location, and brought the repair area to the attention of <br />Lone Star. Once Lone Star made repairs, AMEC checked the repair location to verify <br />completion. AMEC inspected all seams for quality and completion. AMEC personnel <br />conducted a final walk-through to verify completion of the entire geomembrane system and <br />to identify any additional damage that may have occurred during construction operations. <br />AMEC recorded observations made during seaming. For the secondary geomembrane <br />layer, the fusion-welding summary is presented in Appendix K-3, and the extrusion-welding <br />summary is presented in Appendix K-4. For the primary geomembrane layer, the <br />fusion-welding summary is presented in Appendix L-3, and the extrusion-welding summary <br />is presented in Appendix L-4. <br />• <br />AMEC Earth & Environmental, Inc. <br />2000 S. Colorado Blvd 2-1000 <br />Denver, CO 80222 <br />Tel 303-935-6505 <br />Fax 303-935-6575 www.amec.com 53
The URL can be used to link to this page
Your browser does not support the video tag.