My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (181)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (181)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:27 PM
Creation date
12/1/2010 6:47:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL.1 Cover & table of contents
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameo <br />• <br />500-lb. vibratory compactor and "Jumping Jacks." Phase 5 PSSA secondary geomembrane <br />was connected to the existing Phase IVa and Phase IVb geomembrane with a minimum of <br />3 feet of overlap per project requirements and drawings. <br />2.10 Low Volume Solution Collection System <br />The LVSCS is comprised of Low Volume Solution Collection Fill (LVSCF) and the Low <br />Volume Solution Collection Riser (LVSCR) pipes. <br />Ames installed the LVSCS riser pipes to elevation 9770 in September 2010, consisting of <br />three 18-inch diameter DR 11 HDPE LVSCR pipes totaling 517 lineal feet. Pipe sections <br />were connected to each other by fusion welds. Laborers haunched pipes with LVSCF and <br />kept pipes in place during LVSCF placement. <br />Approximately 9,389 lineal feet of 4-inch PCPE LVSCS piping was placed over the <br />• secondary geomembrane layer, prior to placement of LVSCF. <br />Ames began installing the PCPE LVSCS pipes in May 2010, and completed in September <br />2010. Pipe locations are shown on Record Drawing No. 6 in Appendix A. Ames haunched <br />pipes with LVSCF and kept pipes in place during LVSCF placement. <br />Ames began placing LVSCF on the secondary geomembrane layer of the Phase 5 PSSA in <br />May 2010, and completed placement in September 2010. Ames processed LVSCF from <br />December 2009 to June 2010. Ames placed approximately 171,998 cubic yards of LVSCF <br />in the PSSA. In general, LVSCF was placed in a minimum 3-foot thick lift over the <br />secondary geomembrane. LVSCF was placed around the LVSCR in maximum 12-inch <br />loose lifts, and compacted using a hand-operated vibratory plate compactor according to <br />Project Specifications. <br />• <br />AMEC Earth & Environmental, Inc. <br />2000 S. Colorado Blvd 2-1000 <br />Denver, CO 80222 <br />Tel 303-935-6505 <br />Fax 303-935-6575 www.amec.com <br />18
The URL can be used to link to this page
Your browser does not support the video tag.