My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (181)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (181)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:27 PM
Creation date
12/1/2010 6:47:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL.1 Cover & table of contents
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec? <br />Star) of Arlington, Texas completed the installation of geomembrane liner from May 2010 <br />through November 2010. Messrs. Ron Roberts and Tom Shepard represented CC&V as <br />the Construction Managers during the course of the work. All quantities and testing <br />frequencies presented in this report are current as of November 2010, which represents <br />completion of the 2010 Phase 5 VLF, as detailed in this report. <br />1.2 Construction Quality Assurance/Quality Control <br />AMEC provided CQA and CQC monitoring and testing services, and prepared this report <br />describing the monitoring and test results for the 2010 Phase 5 VLF. As-built drawings and <br />supporting CQA monitoring and testing documentation are presented in appendices <br />attached to this report. <br />1.2.1 CQA Monitoring of Earthworks <br />AMEC provided CQC testing and CQA testing and monitoring of earthworks for the 2010 <br />Phase 5 VLF. CQA testing and monitoring of earthworks was provided for in-place materials <br />in accordance with the AMEC Earthworks CQA Plan. The earthworks material <br />specifications for this project are summarized in Table 1. CQC earthworks testing was <br />provided to support the contractor during the manufacture of materials and prior to material <br />placement. The CQC test results are not included in this report because these tests were <br />intended to assist the contractor in materials preparation rather than record testing. <br />AMEC provided CQA laboratory and field testing, and monitored earthworks construction <br />activities as follows: <br />• AMEC visually monitored and documented the remediation of <br />underground workings within the Phase 5 VLF footprint, including <br />verification that Ames excavated underground workings to the minimum <br />specified dimensions and then installed Coarse Shaft Backfill (CSB), <br />Concrete Plug (CP), Cemented Rockfill (CR) Select Structural Fill (SSF), <br />Structural Fill (SF), or geogrid, as specified on the Issued For <br />Construction (IFC) drawings. <br />• <br />AMEC Earth & Environmental, Inc. <br />2000 S. Colorado Blvd 2-1000 <br />Denver, CO 80222 <br />Tel 303-935-6505 <br />Fax 303-935-6575 www.amec.com 2
The URL can be used to link to this page
Your browser does not support the video tag.