My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-29_INSPECTION - C1996084 (2)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996084
>
2010-11-29_INSPECTION - C1996084 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:20 PM
Creation date
11/30/2010 12:04:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
INSPECTION
Doc Date
11/29/2010
Doc Name
Inspection Report
From
DRMS
To
New Elk Coal Company, LLC
Inspection Date
11/22/2010
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 22, 2010 C-1996-084/Lorencito Canyon Mine KAG <br />4 1+? <br />1 <br />9f' al ? , <br />i <br />Bale barriers must extend on the sides of the channel far enough so that flow passes through the center "notch" <br />(above, red arrow) well before flowing around the edges of the barrier (yellow arrows). The Division recommends <br />at least eight inches of available depth of flow without flow, <br />around the edges. Improper installation results in erosion and <br />downcutting (yellow arrows) as shown at right. <br />Ditch re-grading has occurred in area W-2 above the bale',;- <br />barrier installation. Ditch re-grading was also noted above <br />the west downdrain to Fill 7 in area W-3. Significant grading <br />of existing ditches was noted in areas W-5 and W-6. Ditch <br />re-grading appears compete in Area N-2 of both the north and <br />rte" <br />west side of the undisturbed center core. Re-grading was also <br />noted in areas E-1 and E-2. <br />Additional rill and gully maintenance and repair is necessary in areas S-3 and S-4 above the east downdrain to Fill <br />7 and in areas C-1 and C-2 in and around the shrub clump area. Non-destructive measures such as straw bales, <br />check dams, small berms, and straw wattles appear necessary to prevent further downcutting caused by <br />channelized flows. This work should also be completed this winter season as conditions allow. <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 1 <br />Page 3 of 5
The URL can be used to link to this page
Your browser does not support the video tag.