My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-30_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2010-11-30_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:22 PM
Creation date
11/30/2010 12:03:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
11/30/2010
Doc Name
Reclamation Cost Estimate
From
Jim Stark
To
Kent Gorham
Type & Sequence
TR54
Email Name
KAG
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimatina Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name: Colorado Division Of Reclamation, Mining And Safety <br />Task 124 State :Colorado Permit/job #: C-1981-012 <br />Date : 1112912010 County: Las Animas Abbreviation : none <br />User : JRS Site : New Elk Mine Filename : C012-124 <br />Permit or other job action : Technical Revision 54 _ <br />Task description : Replace Topsoil from Stockpile to Transformer and Rock Dust Tank Cut S. <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />(Equipment Description <br />Truck/loader team -Truck : Generic 10-12 cy, 6x4 <br />-Loader : CAT 950G (2002) <br />Support equipment -Load area : Cat D8R Series 11 - 8SU (2005) <br />-Dump area : Cat D8R Series 11 - 8SU (2005) <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer NA NA <br />% Utilization-machine : 100 65 25 100 NA NA <br />-Ripper attachment : NA NA 25 0 NA NA <br />Ownership cost/hour : $13.34 $22.80 $46.56 $46.56 NA NA <br />Operating cost/hour : $38.89 $17.94 $17.66 $70.63 NA NA <br />Ripper op. cost/hour : NA NA $0.00 $0.00 NA NA <br />Operator cost/hour : $22.29 $38.54 $38.54 $38.54 NA NA <br />Unit subtotals : $74.51 $79.28 $102.75 $155.72 NA NA <br />Number of units : 3 1 1 1 0 0 <br />Group subtotals : Work : $302.80 Support : $258.47 Maintenance : $0.00 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 651 <br />Total work team cost/hour : $561.28 <br />Swell Loose <br />BCY factor : 1.250 volume : 814 LCY <br />Source of quantity take-off :Map 11, Sheet 1; Operator Estimate <br />Source of estimated swell factor : CAT Handbook <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : 2,550 pounds/LCY Struck volume : 10.00 LCY <br />Descr.: Earth - Dry packed Heaped volume : 12.00 LCY <br />Rated payload : 35,400 pounds Average volume : 11.00 LCY <br />Payload capacity: 13.88 LCY Adjusted volume': 12.00 LCY <br />Final truck volume based on number of loader passes : 8.25 LCY <br />truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) 7,500 <br />Rated capacity (nom. heaped) : 3.750 LCY Truck Loader Source <br />Descr.: Other - rock/dirt mixtures (100-120%) Altitude adj.: 1.000 1.000 (Cat HB) <br />Bucket fill factor : 1.100 Job efficiency : 0.830 0.830 (1 shif 1day) <br />Adjusted bucket capacity : 4.125 LCY Net correction : 0.830 0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.