Laserfiche WebLink
Truck/Loader Team Work cont'd Task # : 123 sheet 2 of 2 <br />Loadina Tool Cycle Time : Number of loading tool passes required to fill truck : 2 passes <br />Excavators and front shovels -machine cycle time vs. job condition rating : NA <br />- selected value within basic rating : NA <br />Track loaders - material descr.:NA <br />- cycle time elements (min.) : Load : NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders - unadjusted basic loader cycle time ( load, maneuver, and duml 0.550 minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material : Material 314" to 6" diameter 0.000 (Cat HB) <br />Stockpile : Conveyor or dozer piled 10 ft. high or less 0.010 (Cat HB) <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat HB) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : Nominal target 0.000 (Cat HB) <br /> Net cycle time adjustment : -0.070 minutes <br /> Adjusted loader cycle time (total time per loader pass) : 0.480 minutes <br /> Net load time per truck * : 0.580 minutes <br />Truck Cycle Time : ' bulk of 1st loader cycle completed during truck exchange if adj. loader cycle time < exchange time <br />Truck exchange time 0.50 minutes........ Adjusted for site altitude : 0.500 minutes <br />Truck load time: 0.580 minutes........ Adjusted for site altitude : 0.580 minutes <br />Truck maneuver and dump time: 0.90 minutes........ Adjusted for site altitude : 0.900 minutes <br />" set at 0 if exchange time < adj. loader cycle time (truck exchange completed during 1st loader cycle) <br />Truck,travel (haul & return) time: Road condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained <br />Haul route : <br />Road <br />segment # Haul distance <br />(feet) Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%) Speed <br />(feet/minute) Travel time <br />(minutes) <br />1 1,500 4.00 3.00 7.00 1568 0.989 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : Haul time ** : 0.989 minutes <br />Loading tool unit production : 458.33 LCY/hour...... Adjusted for job efficiency <br />Truck unit production : 139.98 LCY/hour...... Adjusted for job efficiency <br />Optimal no. trucks/loading tool : 3 trucks........... Selected no. trucks/loader <br />Adjusted hourly truck team production <br />Adjusted hourly single truck/loader team production <br />Adjusted hourly multiple truck/loader team production <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time <br />Unit cost : $1.638 /LCY Total job cost <br />minutes <br />minutes <br />380.42 LCY/hour <br />116.18 LCY/hour <br />3 trucks <br />348.55 LCY/hr <br />348.55 LCY/hr <br />348.55 LCY/hr <br />62.76 Hours <br />$35,834 <br />travel time shown for each segment includes acceleration/deceleration adjustment Return time**: 0.567 <br />* total haul and return time shown includes altitude adjustment Total truck cycle time : 3.536