Laserfiche WebLink
Final Mitigation Plan for Long Hollow Reservoir <br />La Plata River Mitigation Site (Permit No. 200375243) <br />result, the requirements for site reclamation under the 112 permit from the CDRMS will be met <br />upon completion of the wetland mitigation. <br />2.13.1 Stormwater Management Plan <br />The Project will result in at least one acre of disturbance so that a General Permit for <br />Stormwater Discharges Associated with Construction Activities (Stormwater Construction <br />Permit) will be obtained from the Colorado Water Quality Control Division. As required, this <br />permit will be obtained at least 10 days prior to construction and will include a Stormwater <br />Management Plan (SWMP), a copy of which will be kept on site during construction. <br />Filepath:HP:\Project Files\002-06 LPWCD\2010\Task 13-D Enviro Permit-Compliance-Instrumentation\Section 404\Final Mitigation <br />Plan\FINAL Mitigation Plan-08-11-10.doc <br />August 2010 Bikis Water Consultants, LLC Page 13