Laserfiche WebLink
Page 2, hem #5: Venture Resources has provided the following Mobile Millsite reclamation update to the attached <br />Exhibit D, Rev. 3 (page 6): <br />"This site is fairly flat and previously contained parked and stored equipment. Minimal grading <br />may be necessary prior to re-vegetation operations. Re-vegetation shall be done within the <br />existing native soil (properly neutralized as stated above) according to previously specified <br />techniques as stated in 6.3.4(1)(c)(iii - A)." <br />Additionally, a revised Reclamation Cost Schedule, Rev. 4 has been included as an appendix to Exhibit D, <br />Rev. 3 reflecting the cost implications of this reclamation plan change to the Maximum Disturbance <br />calculation. <br />This response should satisfy the last of the outstanding issues. I wish to ask that if there are additional problems, <br />please telephone me, 303-619-6323, so that we can address them expeditiously. <br />Sincerely OQ.PDo LICFNS <br />Venture Resources, Inc. <br />MES Coo 000 <br />00 <br />:ac 42189 <br />Ryan J. McHale, PE <br />Vice President '. <br />?OA,SSION A\- <br />Attachments: Exhibit C, Rev. 3 <br />Exhibit D, Rev. 3 and revised appendix <br />Reclamation Cost Schedule, Rev. 4 <br />Page 2 of 2