Laserfiche WebLink
1) Measures taken to Minimize Disturbance : If need be, operator will create <br />permanent ditching to direct run-off water from affected area (only case would be <br />snow melt) to ponds which exist on landowner's property but are not a part of the <br />affected acreage of area. <br />m) Deposit is processed on site using the Water JET to quarry or high pressure water <br />extraction (see letter from engineer). Diamond wire saws, cut-off saws, guillotine, <br />polisher, and hand tools are used to process the deposit. <br />n) The commodity mined/extracted is Colorado Rose Red granite composed of red <br />feldspar, black mica, and white quartz. See letter from engineer. <br />o) There are no incidental products extracted. Everything extracted is solid granite <br />blocks and it is all processed. <br />p) No explosives will be used in conjunction with the operation. <br />Exhibit D- Reclamation Plan <br />a) There is no overburden to be replaced. <br />b) Maximum Gradient of Reclaimed Slopes: 5%. <br />c) Measures taken to Revegetate the Site: There was no vegetation to begin with that <br />needs to be replaced. <br />d) What remains after Reclamation: One main access road will remain after <br />reclamation for the use of the landowner. <br />e) Reclamation Treatment: There are no contaminates in granite. The land will be <br />landscaped to be aesthetically pleasing the landowner's eye. <br />Exhibit E- Maps <br />a) There are 4 maps enclosed. <br />1) USGS Topographical View of Area <br />2) Zoomed in Topographical View of Area <br />3) Affected Area of Operation <br />4) Inside Quarry Rooms <br />Exhibit F- List of Other Permits and Licenses Required <br />a) There are no other permits required to operate. <br />Exhibit G- Source of Legal Right to Enter <br />Exhibit H- Municipalities Within a Two-Mile Radius <br />a) <br />Exhibit J- Proof of Mailing Notices of Permit Application <br />a) Not applicable. Operation owner owns land surrounding operation. <br />Exhibit L- Permanent Man-Made Structures <br />a) Non existing. <br />Addendum I - Mailed at a later date. <br />Geotechnical Stability Exhibit- Attached.