My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - C1981008 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2010-11-15_REVISION - C1981008 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:52 PM
Creation date
11/15/2010 3:01:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
11/15/2010
Doc Name
Objection & Request for 2nd Formal Hearing Part 2
From
JoEllen Turner
To
DRMS
Type & Sequence
PR6
Email Name
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 369 <br />Section 4.25.2 <br />114(4)(a) (1) A permit shall be obtained for those operations in accordance with <br />2.06.6. <br />120(2)(g)(D(2) tic ll materials to ha neaii in thA rP�nne +nr4i., +t, farmland enil cha <br />yy > O v�ws.»twvc:yxz px C2xi �r1Mi� ��� <br />- he removed before drilling, blasting. px-mminl?. in accordance wi <br />4.25.3 revents mixin or contaminatin these <br />materials with undesirable material Where removal of soil materia s <br />results in erosion that may cause air and water pollution, the Division <br />shall specify methods to control erosion of exposed overburden. <br />120(2)(1) (3) Revegetation success on prime farmlands shall be measured upon the <br />basis of comparison of actual crop production from the disturbed area, <br />compared to the target level of crop production based on the <br />requirements of 4.15.10 and 4.25.5 as approved by the Division in <br />accordance with 2.06.6(3)(g). If such undisturbed prime farmland is <br />not available for comparison purposes, comparison of production on <br />disturbed areas shall be made with the premining target yields approved <br />by the Division in the permit in accordance with 2.06.6(3)(8). <br />(• (4) j The aggregate total prime farmland acreage shall not be decreased from <br />that which existed prior to mining. Water bodies, i_ f to e <br />constructed during mining an rec amation operations must be located <br />area he creation such water bodies t be approved <br />Divisio and the nLsent o f all ted property owners wi gn e <br />permit t a rea must be obtained. <br />4.25.3 Soil Removal and Stockpiling. <br />� - Unless exempted by Section 34- 33- 114(4)(b) of the Act, surface coal mining <br />operation for all prime farmlands as identified in Section 34- 33- 110(2)(q) of the <br />Act to be mined and reclaimed, must comply with specifications for soil <br />removal, storage, replacement, and reconstruction to be established by the <br />Secretary of the United States Department of Agriculture, and the operator shall <br />be required, as a minimum to: <br />120(2)(8)(1)(1) Segregate the A horizon of the natural soil, except where it can be shown that <br />other available soil materials will create a final soil having a greater <br />productive capacity, and, if not utilized immediately, stockpile within <br />the permit area this material separately from other soil materials and <br />
The URL can be used to link to this page
Your browser does not support the video tag.