My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-10_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2010-11-10_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:56:00 PM
Creation date
11/12/2010 9:22:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
11/10/2010
Doc Name
Response to completeness matters (CN-01)
From
R2Incorporated Environmental and Engineering Services
To
DRMS
Type & Sequence
CN1
Email Name
WHE
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May Day and Idaho Mine Complex 112 (d) Permit Application <br />Upon completion of the underground mill structure at May Day No. 1, the area above the mill and the two <br />portals will be back-filled, compacted to specifications and revegetated (seeded, and planted as appropri- <br />ate). Bare areas surrounding the operational facilities (both active and inactive) that will not be utilized <br />within a year will be appropriately graded to slope, or decompacted by ripping if final grade cannot be <br />achieved until final reclamation, and revegetated. Rock storage areas that are complete and will not re- <br />ceived additional run of mine rock will be graded as appropriate and revegetated. <br />Development of the augmentation pond at the Idaho Operational Area will include interim reclamation of <br />the slopes which will be graded as specified in Exhibit 6.5 - Geotechnical Stability and interim revegeta- <br />tion of these slopes. <br />CDPHE Mandated Stream Restoration of Little Deadwood Gulch <br />Mine rock material within Little Deadwood Gulch at May Day No. 2 and Chief Operational Areas will be <br />removed per Colorado Department of Public Health and Environment (CDPHE) requirements as detailed <br />in Exhibit 6.5 - Geotechnical Stability. Final grading will blend with the surrounding landscape and dis- <br />turbed areas will be revegetated as defined in Section 6.4.5(2)(d) and (f) below. <br />'Failings Storage <br />The storage of mill tailings will be undertaken in the May Day No. 1 underground workings in accor- <br />dance with the Environmental Protection Plan (Exhibit T - Designated Mining Operation). <br />Reclamation Effort 2: Exploration <br />Exploration roads and drill pads will be developed in a sequential order, with only one in development at <br />any given time. During development of these components, vegetative material removed from the explora- <br />tion road corridor and drill pad areas will be moved to the May Day No. 2 portal rock storage/staging <br />area, shipped offsite to an approved landfill, burned or used as mulch. Upon abandonment, all solid waste <br />debris from the formerly active exploration drill pad will be disposed of off-site. The pad site will then be <br />ripped to loosen the surface and revegetated. The exploration roads will be permanent and not require <br />reclamation. <br />Reclamation Effort 3: Closure and Final Reclamation <br />Wildcat will remove, recycle or dispose of liquids and wood from the site in accordance with applicable <br />waste management regulations. To the extent possible, steel sets, process equipment, generators, wire etc <br />will be salvaged. Materials not considered toxic or hazard producing will be dismantled, and cut for dis- <br />posal underground. The solid waste will be placed in the mine rock storage stope. <br />Portals will be appropriately backfilled with crushed rock, sloped and closed in accordance with DRMS <br />requirements. The portals will be barricaded or collapsed. Mine rock will be backfilled on benches such <br />that the mine portal is buried under 5 feet or more of cover and graded with slopes equal to or less than <br />1.5(H):l(V). (Figure E-1) <br />With the exception of the bench out slopes and the portal face (1.5H to 1V), slopes will be reclaimed to <br />2(H):1 (V) or to slopes no steeper than the existing topography where the natural slopes are estimated to <br />be 1(H) to 1(V). Where possible, slopes will be graded to approximate original contour. The post mine <br />topography and reclamation will blend in with the existing topography and vegetation. See Figure F-1 <br />May Day No. 1, Figure F-2, Figure F-3 May Day No. 2, Figure F-4 Idaho, and Figure F-5 for the Lamb <br />and Chief for the post mine reclamation plans. <br />May Day Idaho Mine Complex 112(d) Permit Application <br />September 21, 2010 (REVISED Oct. 22, 2010) <br />3
The URL can be used to link to this page
Your browser does not support the video tag.