My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-05_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2010-11-05_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:34 PM
Creation date
11/5/2010 9:44:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
11/5/2010
Doc Name
Midterm Review Findings Document
From
DRMS
To
Twentymile Coal Company
Type & Sequence
MT6
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />DIRECT COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 14-Oct-2010 Permit or job no. C-1982-056 Site : Foidel Creek Mine <br />User : JDM Abbreviation : none State :Colorado <br />Task : 01D Filename : C056-01D County :Routt <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or job action :2010 Midterm Review <br />Task description : Topsoil (cont), Revegetation, Facilities Demolition and Borehole Sealing Tasks <br />TASK L IST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> Topsoil (cont) <br />189 -Replace topsoil on east central portion of 18RT access road scraperl 1 2.0 $1,487 <br />190 -Replace topsoil on NE portion of 18RT access road scraperl 1 0.6 $436 <br />204 -Replace topsoil on West haulroad (TR55) scraperl 1 0.9 $599 <br />208 -Replace topsoil at underflow borehole scraperl 1 0.8 $489 <br />210 -Replace 12" topsoil on 6MN reservoir disturbances (TR61) dozer 1 21.3 $4,102 <br />218 -Respread topsoil on OSP#1 (MR233) dozer 1 5.7 $1,405 <br /> Revegetation <br />091 -Rangeland area seeding revege 2 235.6 $527,230 <br />183 -Seed 6MN pad and access oad (TR48) revege 1 13.5 $15,105 <br />191 -Seed 18 RT access road topsoil footprints and borehole pad (TR50 &MR revege 1 1.4 $1,589 <br />212 -Seed 20.1 acres (TR61, MR228, MR230, and MR233) revege 1 20.1 $22,490 <br /> Facilities Demolition <br />092 -Facilities Demolition demolish 10 3,387.3 $3,387,319 <br /> Borehole Sealing <br />90a -Seal shallow holes (<100 ft. deep) borehole 1 7.9 $2, 776 <br />90b -Seal deep holes (>100 ft deep) borehole 1 94.8 $66,785 <br />_ <br />90c -Seal drill holes borehole 2 99.4 $176,710 <br />90d -Seal 5 large diameter shafts mineseal 1 94.8 $123,897 <br />90e -Seal misc. boreholes borehole 1 74.21 $123,904 <br /> <br />181 -Push cuttings back into 6MN vent shaft (prev. TR48 task 808) dozer 1 34.5 $8,893 <br />201 -Backflll West Haulroad truck scale foundation and pit dozer 1 0.4 $118 <br />205 -Backfill and grade wash plant 11 area (TR59) dozer 2 15.7 $8,119 <br />200 -Mob/demob equipment mobilize 41 3.3 $20,838 <br />220 -6MN118RT N injection system and met. station (MR235) dozer 1 8.0 $1,688 <br />221 -18LT Vent Shaft installation NA 1 36.0 $149,914 <br />222 -Demolish 10RT pumphouse addition, facilities and seal monitoring hole ( demolish 1 7.5 $8,008 <br />223 -Remove water treatment pilot facilities demolish 1 3.0 $9,450 <br />224 -Reclaim 6RT thickener underflow borehole and pipeline (TR69) dozer 1 24.0 $15,180 <br />225 -Security gate and gaurd shack (MR240) demolish 1 20.0 $14,275 <br />226 -18LT water transfer pipeline (TR70) dozer 1 68.51 $13,397 <br /> (TR70 costs were reduced in TR74 due to an acre discrepancy) <br />227 -CRDA expansion 1st construction segment (TR67) NA 1 147.1 $380,020 <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 4,429.1 $5,086,223
The URL can be used to link to this page
Your browser does not support the video tag.