Laserfiche WebLink
CIRCES Cost Estimating Software <br />DIRECT COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 14-Oct-2010 Permit or job no. C-1982-056 Site : Foidel Creek Mine <br />User: JDM Abbreviation : none State :Colorado <br />Task : 01C Filename : C056-01C County :Routt <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or job action :2010 Midterm <br />Task description :Ponds and Topsoil Tasks <br />TASK L IST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> Ponds <br />051 -Backfill and regrade Pond B dozer 1 9.0 $2,192 <br />052 -Backfill and regrade Pond C dozer 1 21.6 $5,273 <br />053 -Backfill and regrade Pond D dozer 1 34.4 $8,382 <br />054 -Backfill and regrade Pond E dozer 1 17.51 $4,262 <br />055 -Backfill and regrade Pond F dozer 1 32.6 $7,946 <br />056 -Backfill and regrade Pond G dozer 1 43.1 $10,503 <br />057 -Backfill and regrade Pond T dozer 1 2.8 $704 <br /> Topsoil <br />064 -Remove spoil material fill from coal handling facility area scraperl 2 41.9 $68,139 <br />065 -Redistribute topsoil over portal surface area scraperl 2 38.5 $61,870 <br />066 -Topsoil office/bathhouse scraperl 2 39.85 $63,988 <br />067 -Redistribute topsoil over parking lot and laydown area scraperl 2 52.31 $85,185 <br />068 -Topsoil stroker coal loading area scraperl 2 1.3 $1,359 <br />069 -Place 3 FT clay cover over refuse pile scraperl 3 134.0 $322,376 <br />070 -Topsoil access/haul roads scraperl 1 7.0 $8,557 <br />071 -Redistribute topsoil on refuse area scraperl 2 99.4 $179,283 <br />072 -Topsoil Haulroad B scraperl 1 63.1 $76,153 <br />075 -Distribute topsoil on explosives storage area scraperl 1 4.5 $4,654 <br />080 -Topsoil Fish Creek Borehole area and road scraperl 1 9.8 $11,855 <br />081 -Topsoil tipple and Haulroad C scraperl 1 55.91 $57,428 <br />116 -Topsoil from PPSP2 to Pond E and Haulroad B scraperl 1 4.0 $4,140 <br />117 -Topsoil from SF4 to Pond E relocation area scraperl 1 3.0 $3,167 <br />118 -Topsoil from PPSP-1 to Pond E relocation scraperl 1 5.8 $6,035 <br />121 -Replace topsoil on batch/weigh loadout stockpile area scraperl 1 4.2 $4,385 <br />134 -Replace topsoil on EMD dewatering borehole dozer 1 13.0 $1,686 <br />144 -Replace topsoil on EMD vent shaft site dozer 1 82.6 $10,679 <br />158 -Move topsoil pile T-1 from Middle Creek to Fish Creek Tipple truckl 1 39.5 $37,327 <br />166 -Transport and spread topsoil to "Trudy's Corner" truckl 1 12.1 $10,021 <br /> Task 167Topsoil replacement on Trout Creek drill hole NA <br />174 -Grade out windrowed/stockpiled topsoilonto NW Mains vent and pad dozer 1 3.7 $972 <br />180 -Replace topsoil on 6MN Pad (prev. TR48 Task 807) dozer 1 8.7 $2,249 <br />193 -Replace topsoil on 18RT shaft pad (prey. TR44 Task 182) loader 1 16.11 $1,761 <br />176 -Replace topsoil on 6MN Vent Shaft Pad (TR48) dozer 1 16.7 $4,077 <br />177 -Replace topsoil on 6NM access roads from 2 topsoil piles (TR48) dozer 1 7.2 $1,752 <br />188 -Replace topsoil on west portion of 18RT access road (TR50) scraperl 1 3.2 $2,366 <br /> <br /> <br /> d( <br />SUBTOTALS : 929.81 $1,070,726