My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-03_INSPECTION - M1977300
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977300
>
2010-11-03_INSPECTION - M1977300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:29 PM
Creation date
11/5/2010 7:55:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
INSPECTION
Doc Date
11/3/2010
Doc Name
Insp Rpt
From
DRMS
To
Cotter Corporation
Inspection Date
10/18/2010
Email Name
DB2
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 4) <br />MINE ID # OR PROSPECTING ID #: M-1977-300 <br />INSPECTION DATE: 18 Ortohpr 2010 INSPECTOR'S INITIALS: DB2 <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION DATE <br />? 1. Problem: The operator reported a release of water from the mine pool through the mystery pipe 12/03 /2010 <br />and an overflow of water from the water treatment plant due to a filter malfunction. These are <br />considered problems requiring spill reporting in accordance with Rule 3.13. <br />PB or PV: PB <br />TOPIC(S): L <br />Corrective Actions Submit a report in accordance with Rule 3.13 including at a minimum: AT OD <br />Date and Time of spill Estimated rn., nt of fluids I ased from both incidents and whether any <br />fluids left the permit area; Initial measures taken to contain and clean up the spill; Results of <br />transducer readings during the time spill was occurring from the mine pool; Results of the mine pool <br />2. Problem: The operator has not reported analytical results of ground water quality sampling 12 /03 / 2010 <br />since the May 2010 sampling event <br />PB or PV: PB_ <br />TOPIC(S): Ali <br />Corrective Action: Submit all ground water quality data collected since May 2010. This must be HB AT <br />provided within 30 dayjs of the date of this report- With each monthly s ,rfa a water Quality <br />monitoring report, the Operator must also include the results of all ground water quality sampling for <br />that period
The URL can be used to link to this page
Your browser does not support the video tag.