Laserfiche WebLink
Seneca 11-W- Phase I Bond Release (SL-3) 912112010 <br />Peabody Coal Co. to 912312010 <br />Permit Number: C-1982•057 Christy Hulsman <br />r <br />M ?Fv <br />Yc, v ? <br />Fig, 1. - Scraper Road removal, <br />north €Jj QO6--NFJ -hanrief <br />Page 1 of 14 <br />Seneca 11-W - Phase I Bond Release (SL-3) 912112010 <br />Peabody Coal Co. to 912312010 <br />Permit Number: C-1982•-057 Christy Hulsman <br /> <br />tie <br />Fig. 3 - Channel QLl64VE2. Repaired <br />after SL-2 phase I Fund Release. <br />Page 3 of 14 <br />Seneca fl-W - Phase l Bond Release (SL-3) 912112010 <br />Peabody Coal Co. to 912312010 <br />Permit Number: C-1982-057 Christy Hulsman <br />Fig. 2 - 0vervieW off" Scraper Road <br />removal and grading <br />Page 2 of 14 <br />Seneca 11-W- Phase I Bond Release (SL-3) 912112010 <br />Peabody Coal Co. to 912312010 <br />Permit Number: C-1982-057 Christy Hulsman <br />... y <br />J .; <br />Fig. 4 - Channel 006 Gulch. <br />Exchudea' from SL-2 bond release. <br />Rip,'-rap replaced to improve <br />stability for SL-3 release, <br />Page 4 of 14