Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ Permit Field Visit <br />Person SENECA COAL CO. Number C-057-82 Date 09/21/2010 Continuation Page <br />28. Performance Standard Categories <br />Codes: 1=Compliance, 2=Noncompliance, 3=Not Planned, 4=Not Started, 5=Noncompliance Identified Elsewhere, 6=Previously Cited <br />A. <br />B. <br />C. <br />Administrative <br />1. _ Mining within Valid Permit <br />2 _ Mining within Bonded Area <br />3. _ Terms & Conditions of Permit <br />4. _ Liability Insurance <br />5. _ Ownership and Control <br />6. - Temporary Cessation <br />7. - AML Rec. Fees -- Non-Respondent <br />8. _ AML Rec. Fees -- Failure to Pay <br />Hydrologic Balance <br />1. 1 Drainage Control <br />2. Inspections & Certifications <br />3. 1 Siltation Structures <br />4. 1 Discharge Structures <br />5. Diversions <br />6. Effluent Limits <br />7. Ground Water Monitoring <br />8. Surface Water Monitoring <br />9. Drainage -- Acid-Toxic Materials <br />10. Impoundments <br />11. Stream Buffer Zones <br />Topsoil & Subsoil <br />1. Removal <br />2. Substitute Materials <br />3.- Storage and Protection <br />D. Backfilling & Grading H. 3 Subsidence Control Plan <br />1. Exposed Openings I. Roads <br />2. Contemporaneous Reclamation 1. Road Construction <br />3. 1 Approximate Original Contour 2, Certification <br />4. 1 Highwall Elimination 3. 1 Drainage <br />5. 1 Steep Slopes (includes downslope) 4. Surfacing and Maintenance <br />6. Handling of Acid & Toxic Materials 5. 1 Reclamation <br />7. Stabilization (rills and gullies) J. Signs & Markers <br />E. Excess Spoil Disposal 1. Signs <br />1. 1 Placement 2. Markers <br />2. 1 Drainage Control K. <br />Distance Prohibitions <br />3. 1 Surface Stabilization _ <br /> <br />4. <br />Inspections & Certifications L. Reve etation <br />V <br /> <br />F. Coal Mine Waste 1. <br />egetative Cover <br />(Refuse Piles/]mpoundments) 2. Timing <br />Timing <br /> <br />1. <br />_ Drainage Control M. 1 <br />nin Land Use <br />- g <br />2. Surface Stabilization N. Other <br />3. Placement General <br />4. Inspections and Certifications Performance <br />5. 3 Impounding Structures Catagory <br />G. Us <br />1. e Of Explosives M <br />Blaster Certification - 1 1) phase I Bond Release <br />- <br />2. Distance Prohibitions 2) <br />3. Blast Survey/Schedule - - <br />4. _ Warnings & Records 3) <br />5. Control of Adverse Effects <br />- - <br />A. <br />B. <br />Performance Standard Catagories <br />30 CFR Counterpart <br />Administrative <br />......................................................................... <br />1. Valid Permit .....................................................................................773.11 <br />2. Mining within Bonded Area .................. ..............................773.11 <br />3. Terms & Conditions of Permit ............... ..............................773.17 <br />4. Liability Insurance .................................. ..............................800.60 <br />5. Ownership and Control .......................... ..............................778.13 <br />6. Temporary Cessation .............................. 842.11(e) & 816/817.131 <br />7. AML Rec. Fees -- Non-Respondant ....... .........................870.15(b) <br />8. AML Rec. Fees -- Failure to Pay ............ .........................870.15(a) <br />Hydrologic Balance ........................... ...........(816/817.41-57) <br />1. Drainage Control .................................... .....................................45 <br />2. Inspections & Certifications ................... ..........................49(a)(10) <br />3. Siltation Structures ................................. .....................................46 <br />4. Discharge Structures .............................. .....................................47 <br />5. Diversions ............................................... ....................................43 <br />6. Effluent Limits ........................................ ....................................42 <br />7. Ground Water Monitoring ...................... ................................41(c) <br />8. Surface Water Monitoring ...................... ................................41(e) <br />9. Drainage--Acid - Toxic Materials ........... ................................41(f) <br />10. Impoundments ........................................ ....................................49 <br />11. Stream Buffer Zones ............................... ....................................57 <br />E. Excess Spoil Disposal ...........................................(816/817.71-74) <br />1. Placement ...........................................................................................71(e) <br />2. Drainage Control ................................................................................71(f) <br />3. Surface Stabilization ...........................................................................71(g) <br />4. Inspections & Certifications ...............................................................71(h) <br />F. Coal Mine Waste (Refuse Piles/Impoundments) ,,,,,(816/817.81-84) <br />1. <br />3. <br />4. <br />5. <br />G. <br />1. <br />2. <br />3. <br />4. <br />5. <br />H. <br />I. <br />1. <br />2. <br />3. <br />4. <br />5. <br />C. Topsoil & Subsoil ...............................................(816/817.22) <br />1. Removal ..................................................................................22(a) <br />2. Substitute Materials .................................................................22(c) <br />3. Storage and Protection .............................................................22(c) <br />4. Redistribution ..........................................................................22(d) <br />D. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />J. <br />Backfilling & Grading ..............................(816/817.95-107) K <br />Exposed Openings .....................816/817.13, 14, 15, & 823.11 & 2] L <br />Contemporaneous Reclamation ......................................... .........100 <br />Approximate Original Contour .......................................... 102(a)(1) I <br />Highwall Elimination ......................................................... 102(a)(2) 2. <br />Steep Slopes (includes downslope) .................................... ........107 M. <br />Handling of Acid & Toxic Materials ................................. .....102(c) <br />Stabilization (rills and gullies) ...................................... I ..... .......95(b) <br />Drainage Control ................................................ ...............................83(a) <br />Surface Stabilization ............................................ ..............................83(b) <br />Placement ............................................................. ............................;.83(c) <br />Inspections and Certifications .............................. .............................83(d) <br />Impounding Structures ......................................... ..................................84 <br /> <br />.... <br />Use of Explosives .................................... <br />..........(816/817.61-68) <br />Blaster Certification ............................................. ..............................61(c). <br />Distance Prohibitions .......................'.................... ..............................61(d) <br />Blast Survey/Schedule ................. 62-64 <br />Warnings & Records ........................................... ...........................66 & 68 <br />Control of Adverse Effects ................................... ..................................67 <br />Subsidence Control Plan ............................ .............(817.121-122) <br />Roads ........................................................... ......(816/817.150-151) <br />Road Construction ................................................ ...........................150(c) <br />Certification .......................................................... ............................151(a) <br />Drainage ............................................................... ................150(b -151(d) <br />Surfacing and Maintenance .................................. ................150(e)-151(d) <br />Reclamation .......................................................... ............................150(f) <br />Signs & Markers ........................................ ...............(816/817.11) <br />Signs ..................................................................... ................ I l (a),(b),&(c) <br />Markers ................................................................ ...... I I (a),(b),(d),(e),&(f) <br />Distance Prohibitions ................................. ......................(761.11) <br />Revegetation .....................................................(816/817.111-116) <br />Vegetative Cover .................................................. .....................1 l 1 & 116 <br />Timing .................................................................. ................................113 <br />Postmining Land Use ..............................................(816/817.133) <br />Revised December 4, 1999 Page 2 of