Laserfiche WebLink
a) A complete list of target species that will be monitored and controlled; <br />b) Methods of control that will be employed to treat occurrences of target <br />species; <br />C) Treatment windows tied to the various control methods that may be utilized; <br />d) A monitoring plan that will ensure that treated areas receive follow-up site <br />inspections and secondary treatment as necessary, and that the remainder of <br />the site is being monitored on a regular basis for early detection and <br />treatment. <br />STIPULATION # 3 <br />The applicant will submit a single map clearly illustrating the extent of the proposed <br />affected or disturbed area within the boundaries of the permitted area. This should <br />include all areas ancillary to the development of the phase I mining area, including <br />but not limited to, roads, rail lines, ponds, topsoil stockpile locations, plant <br />development areas, surface water control structures, pit development, etc. <br />Finally, in accordance with Rule 1.4.9(2)(c), attached to this letter is a copy of the <br />Division's Rationale for Recommending Approval. This rationale identifies issues raised <br />by the division and the objectors and provides a basis for the recommendation. <br />If you have any questions concerning this recommendation, the public hearing, or any <br />other aspect of the permitting process, please contact Al Amundson or me at (303) 866- <br />3567. <br />r ly, <br />AIA411, <br />thon aldron <br />Environmental Protection Specialist <br />Ec: Harry Posey-DMG <br />Al Amundson-DMG <br />Steve Brown-AGO <br />Tom Roan-AGO <br />Cc: Paul Seby <br />Adam DeVoe <br />List of Parties to the Hearing (see attached certificate of service) <br />CMLRB <br />Enclosure(s) <br />Certificate of Service <br />Rationale