Laserfiche WebLink
Varra Companies, Inc. <br />Office of Special Projects <br />8120 Gage Street Frederick Colorado 80516 Telephone (970) 353-8310 Fax(970)353-4047 <br />There is not enough topsoil/growth medium on the site to fulfill the re-soiling <br />requirement. It is unclear if overburden has already been backfilled in portions <br />of these areas. Please indicate which areas have been capped with overburden, <br />if any, and identify the location of any overburden piles located on the site and <br />an estimate of their volume. Please provide an estimate of the amount of <br />overburden and topsoil that will need to be imported into the site to fulfill the <br />Operators commitments. The financial warranty will need to be increased in <br />order to cover the cost of importation of this material. <br />Another option as discussed in the first adequacy review is to withdraw this <br />Technical Revision and submit an amendment to the permit and update the <br />reclamation plan outlining the intended use of these areas. <br />The need, common to agricultural areas, lacked specifics in our original <br />reply. Please consider the attached list of agricultural equipment and <br />stockpiles planned for the area, which will be amended over time as part <br />of the return to A-Agricultural use over this segment of the parcel. One <br />of the filter strips of grass could be moved as well from the south <br />boundary to the north boundary of the storage area, to give a greater <br />separation of an additional 50 feet in width from the planned storage area <br />and St. Vrain Creek. If this is acceptable to the OMLR, we will revise the <br />attending map accordingly. <br />Item #2 Clay liner of the Northwest Pond: <br />Based on our conversations and the Technical Revision narrative, the Office of <br />the State Engineers (SEO) leak test for the clay liner is pending for the <br />northwestern pond. Until the SEO has certified the clay liner, the Division will <br />need to hold a bond to replace the clay liner. Please submit evidence the SEO <br />has certified the clay liner for the northwest pond or submit an estimate of the <br />cost to replace the clay liner for the financial warranty estimate. <br />The operator is blessed with adequate water to assure the Colorado State <br />Engineer Division of Water Resources that it has sufficient water to commit, and <br />will, commit to the complete unlined state of the operations until the basins are <br />lined. A letter will be obtained from the State Engineer to assure the Office of <br />Varra Companies, Inc. correspondence to the Colorado Office of Mined Land Reclamation (Office) in reply to 2 <br />Office correspondence of 29 July 2010 - Dakolios Pit - M-1984-036.