Laserfiche WebLink
TWENTYMILE COAL COMPANY - FOIDEL CREEK MINE <br />MR10-250 -18-LEFT UTILITY BOREHOLE <br />SUMMARY OF REVISIONS/ADDITIONS (11/01/10) <br />REVISION/ADDITION DESCRIPTION PLACEMENT INSTRUCTIONS <br />OPERATIONS PLAN - MINE FACILITIES (RULE 2.05) <br />Pages 2.05-45.14, 45.15, Revised operations and Replace Pages 2.05-45.14, 45.15, <br />45.16, 45.17, 45.18, 45.19, reclamation plan text describing 45.16, 45.17, 45.18, 45.19, 45.20, <br />45.20, and 106.1 utility borehole and rock-dust and 106.1 in Volume I <br /> tank installation <br />EXHIBITS <br />Exhibit 49R, 18LT Shaft Design drawings and Insert at back of Exhibit 49R in <br />Installation - Design Drawings specifications for utility borehole Volume II-E <br /> and rock-dust tank installation