Laserfiche WebLink
18-LEFT UTILITY BOREHOLE AND ROCK-DUST TANK (MR10-250) <br />RECLAMATION COST ESTIMATE <br />Facilities Demolition and Removal <br />Equipment Removal <br />Remove rock-dust tank - (crane and flatbed truck, '/z day @ $3,000/day) $1,500 <br />Concrete Demolition <br />Concrete piers - (4 - 24-inch diameter x 26 foot piers) x $8.55/cf 2,800 <br />Concrete pad - (5 x 5 x 1 foot) x $8.55/cf 220 <br />Borehole Reclamation <br />Borehole Sealing - 27 cy @ $60/cy 1,620 <br />Site Reclamation <br />Included in present bond <br />Subtotal - All Direct Costs $6,140 <br />Indirect and Administrative Costs (@ 8%) 500 <br />Total Estimated Reclamation Cost $6,640 <br />Notes: Costs from Means Site Work and Landscape Cost Data and recent bond calculations <br />MR 10-250 11/01/10