My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-27_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-10-27_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:26 PM
Creation date
11/1/2010 9:39:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/27/2010
Doc Name
CQA Rpts: 2010: 9/19, 9/26, 10/3 and 10/10.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec'O <br />III) Material Processing <br />A) Drain Cover Fill Process Area <br />Drain Cover Fill (DCF) was processed during the week. <br /> <br />Location This Week Cumulative <br />Comments <br /> tons tons <br />DCF Process 14,551 156,561 <br />Total 14,551 156,561 <br />IV) VLF Geosynthetics <br />A) Geomembrane Installation <br />1) VLF <br />Geomembrane installation within the Phase 5 VLF continued performing deployment, <br />seaming, and repair/QC activities. Geomembrane installation was performed in the area shown <br />on Figures 3a, 3b and 3c. Approximately 265,406 square feet of primary 80mi1 LLDPE and <br />primary 100mil LLDPE was deployed using a John Deere 200 excavator and a John Deere 544 <br />front-end loader with spreader-bar attachments. Subgrade was inspected and approved by <br />AMEC and Lone Star representatives prior to geomembrane deployment (see Figures 3a, 3b <br />and 3c). Approximately 13,891 linear feet of seam was fusion welded using to two fusion <br />welding machines. Twenty-nine destructive test samples were marked during fusion seaming. <br />All destructive tests performed were within project specifications. Non-destructive testing was <br />performed for fusion welded seams. Repairs were performed using the extrusion welding <br />method for all marked defects. Vacuum testing was performed for all extrusion welded seams <br />and repairs. <br />B) Anchor Trench <br />1) VLF <br />Anchor trench backfill was performed between stations G15+00 (+/-) and G23+00 (+/-) and <br />between stations E21+00 (+/-) and E23+50 (+/-) using a John Deere 35D excavator and <br />laborers. An AMEC representative observed and inspected the anchor trench backfill. The <br />trench was found to be backfilled in accordance with design drawings and project <br />specifications. <br />Anchor trench excavation was performed between stations K4+00 (+/-) and A64+20 (+/-) <br />using a CAT 312 excavator and laborers. An AMEC representative observed and inspected the <br />anchor trench excavation. The trench was found to be constructed in accordance with design <br />drawings and project specifications. <br />C) Geomembrane Acceptance <br />1) VLF <br />Primary 80mi1 geomembrane (P-86 thru P-113) shown on Figure 4a and primary 100mil <br />geomembrane (P-402 thru P-415, P-496 thru P-522, P-524 and P-525) shown on Figures 4b <br />and 4c, were inspected by AMEC and Lonestar representatives and found to be installed within <br />project specifications and acceptable for continued construction activities. <br />VLF Weekly Report WE 10.02.10.1)
The URL can be used to link to this page
Your browser does not support the video tag.