My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-27_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-10-27_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:26 PM
Creation date
11/1/2010 9:39:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/27/2010
Doc Name
CQA Rpts: 2010: 9/19, 9/26, 10/3 and 10/10.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amecl* <br />inspected by an AMEC field representative and found be constructed in accordance with the <br />design drawings and project specifications. <br />Construction of the 26" high volume solution collection piping was performed fusing the <br />previously perforated pipe sections together. <br />2) Drain Cover Fill (DCF) <br />Drain cover fill (DCF) placement within the Phase 5 VLF continued. DCF was placed in the <br />area show on Figures 6a and 6b. The DCF was hauled from the processing area to the <br />placement area using CAT 740 haul trucks. The DCF was placed in a 2-foot lift using a two <br />CAT D-6 LGP dozers and a CAT D-8 dozer except where haul routes were established. Haul <br />route consisted of five-foot lifts to be spread into 2-foot lifts later. Laborers were present at all <br />times during placement holding the high volume collection piping in place, removing <br />debris/sandbags, and assisting the dozer operator with lift thickness. All DCF was placed on <br />previously approved primary geomembrane. AMEC field representatives monitored the DCF <br />placement constantly. <br />Backfilling of the high volume solution collection risers and manifold was performed using a <br />CAT D-6 LGP dozer and a Komatsu 300 excavator. DCF material was pushed to the Komatsu <br />300 excavator and cast onto the risers. This was performed to allow for the continued <br />construction of the risers. <br />3) Ore Placement <br />Ore placement near the high volume solution collection began using a CAT D-8 dozer. The ore <br />was hauled from the leading edge of the Phase IV heap placement using 40-ton articulating <br />haul trucks loaded by a CAT 385 excavator. <br />In Storm Water Management <br />A) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. <br />VLF Weekly Report WE 10.02.10.13
The URL can be used to link to this page
Your browser does not support the video tag.