October 21, 2010 C-1983-059/Terror Creek Loadout JJD <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />R - Air Resource Protection R -Roads <br />R - Availability of Records NA - Reclamation Success <br />NA - Backfill & Grading R - Revegetation <br />NA - Excess Spoil and Dev. Waste NA - Subsidence <br />NA - Explosives Y - Slides and Other Damage <br />Y - Fish & Wildlife R - Support Facilities On-site <br />R - Hydrologic Balance R -Signs and Markers <br />Y - Gen. Compliance With Mine Plan NA - Support Facilities Not On-site <br />NA - Other NA - Special Categories Of Mining <br />NA - Processing Waste R -Topsoil <br />COMMENTS <br />AIR RESOURCE PROTECTION - Rule 4.17: <br />There were no indications of fugitive coal dust problems during the field inspection. Although the day was <br />windy, no coal dust was seen coming off of the small coal stockpiles on the facilities bench or from the several <br />loaded coal rail cars on site. In addition, no coal fines were seen being tracked onto the highway. <br />AVAILABILITY OF RECORDS - Rule 5.02.4(1): <br />All of the required loadout records were in compliance, as documented on the attached records checklist. <br />HYDROLOGIC BALANCE - Rule 4.05 ; !'-j Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, <br />4.05.6; Discharge Structures 4.05.7, 4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water <br />Monitoring 4.05.13; Surface Water Monitoring 4.05.13; Drainage - Acid and Toxic Materials 4.05.8; <br />Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br />The elevation of the standing water in the east side sediment pond was about 2 feet below the primary <br />discharge pipe elevation. The gated primary valve was closed. The pond embankment was well vegetated and the <br />open channel emergency spillway was clear of any debris. Pond inslopes were stable. <br />The west side sediment pond was dry. The open channel combination spillway was clear of debris and the <br />riprapped outslope was in place. <br />All of the loadout culverts were clear and the collection ditches had sufficient capacity. The straw bales and silt <br />fence were in place along the railroad small area exemption. There was some upland diversion water flowing <br />through the diversion system. <br />ROADS - Rule 4.03F '.1 Construction 4.03.1(3)/4.03.2(3)[1 El Drainage 4.03.1(4)/4.03.2(4) ? Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6)1- "'Reclamation 4.03.1(7)/4.03.2(7): <br />The paved haul road at the main entrance was in good condition. The guard rail was in place. The graveled <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 2 of 5