My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-22_INSPECTION - C1981019
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
2010-10-22_INSPECTION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:06 PM
Creation date
10/25/2010 1:10:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
INSPECTION
Doc Date
10/22/2010
Doc Name
Inspection Report
From
DRMS
To
Colowyo Coal Company L.P.
Inspection Date
10/19/2010
Email Name
KAG
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 19, 2010 C-1981-019/Colowyo Coal Mine KAG <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />N - Air Resource Protection N - Roads <br />N - Availability of Records N - Reclamation Success <br />R - Backfill & Grading N - Revegetation <br />N - Excess Spoil and Dev. Waste N - Subsidence <br />N - Explosives N - Slides and Other Damage <br />N - Fish & Wildlife N - Support Facilities On-site <br />N - Hydrologic Balance N - Signs and Markers <br />N - Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br />N - Other N - Special Categories Of Mining <br />N - Processing Waste N - Topsoil <br />COMMENTS <br />This was a partial inspection conducted by Kent Gorham of the Colorado Division of Reclamation, Mining, and <br />Safety. Ryan Pawlowski represented the operator during the inspection. Colowyo is a large, multi-seam surface <br />mining operation that produces in excess of 2 million tons of coal each year. The weather on this day was clear <br />with patchy fog in the morning hours. Ground conditions were excellent. <br />Backfilling and Grading <br />The operator is currently regrading the 2010 area in the East Pit as shown on Map 29 Spoil Grading. Two D-11 <br />dozers were pushing spoil to the final approved post-mining topography aided by GPS technology. They were <br />also cutting the channel of the North Tributary of the East Pit. The photos below show the regraded area of the <br />divide between the Prospect Ditch watershed and the North Tributary watershed. <br />Number of Partial; Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 1 <br />Page 2 of 8
The URL can be used to link to this page
Your browser does not support the video tag.