My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-22_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2010-10-22_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:08 PM
Creation date
10/22/2010 1:32:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
10/22/2010
Doc Name
Letter Enclosing Revised Cost Estimate
From
DRMS
To
Trapper Mining Inc.
Type & Sequence
MT6
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name: Colorado Division Of Reclamation Mining And Safety <br />Task #: 025 State : Colorado Permit/job #: C-1981-010 <br />Date : 0310412010 County :Moffat Abbreviation :none <br />User : JDM Site : Trapper Mine Filename : C010-025 <br />Permit or other job action :2010 Midterm Review <br />....--------------- <br />Task description : Regrade K-Pit Truck/Loader Costs <br />HOURLY EQUIPMENT COST dm§hift basis : 3 per day <br />Equipment Description <br />Truck/loader team -Truck : Cat 777D <br />-Loader : CAT 992G high lift <br />Support equipment -Load area : NA <br />-Dump area : Cat D10R - 10SU (2005) <br />Road maintenance -Motor grader : CAT 16H <br />-Water truck : Water Tanker. 2.5nn nal <br />Cost Breakdown : ruck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA dozer grader misctruk <br />% Utilization-machine : 70 100 NA 100 50 5 <br />0 <br />-Ripper attachment : NA NA NA 0 NA __ <br />_ <br />NA <br />Ownership cost/hour : $39.94 $88.59 NA $37.63 $27.26 $4.56 <br />Operating cost/hour : $79.72 $149.80 NA $128.30 $30.29 $6.94 <br />Ripper op. cost/hour : NA NA NA $0.00 $0.00 NA <br />Operator cost/hour : $22.54 $38.97 NA $38.79 <br />$24.75 <br />$38.95 <br />Unit subtotals : $142.20 $277.36 NA $204.72 $82.30 $5 <br />0.45 <br /> <br />Number of units <br />F:4:? <br />1 <br />0 <br />1 <br />1 . <br />__ <br />Group subtotals W: $846.15 Support: $204.72 Maintenance : $132.76 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume: 5,644,528 LCY factor <br />Total work team cost/hour : $1,183.62 <br />Loose <br />NA volume : 5.644.528 LCY <br />Source of quantity take-off : Operator Estimate <br />Source of estimated swell factor :Operator Estimate <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : .2,475 pounds/LCY Struck volume : <br />Descr.: USER-PROVIDED WEIGHT DATA Heaped volume : <br />Rated payload : 199,220 pounds Average volume : <br />Payload capacity : 80.49 LCY Adjusted volume*: <br />Final truck volume based on number of loader passes <br />truck volume adjusted to not exceed rated payload or heaped volume <br />54.80 <br />78.80 <br />66.80 <br />78.80 <br />67_R1 <br />LCY <br />LCY <br />LCY <br />LCY <br />LCY <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) : 6,4 <br />00 <br />Rated capacity (nom. heaped) : 15.500 LCY Truck Loader . <br />---- <br />Source <br />Descr.: Blasted rock - well blasted (80 - 9591o) Altitude adj.: 1.000 1.000 (Cat <br />HB) <br /> <br />Bucket fill factor : 0.875 <br />Job efficiency : <br />0.790 <br />0.790 _ <br />_ <br />(3 shifts/day) <br />Adjusted bucket capacity : 13.562 LCY Net correction : 0.790 0.790
The URL can be used to link to this page
Your browser does not support the video tag.