Laserfiche WebLink
CIRCES Cost Estimating Software <br />DIRECT COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 05-Mar-2010 Permit or job no. C-1981-010 Site : Trapper Mine <br />User: JDM Abbreviation : none State : Colorado <br />Task : OOD Filename : C010-00D County :Moffat <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />----------- ------ ----- <br />Permit or job action :2010 Midterm Review <br />----------------- <br />ask description : Summary of Topsoll Replacement, Revegetation, and Micellaneous Tasks <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />090 -Replace Topsoil on ASh Dump Pit Area scraperl 8 211.81 $650,212 <br />- 091- -Replace Topsoil on DIE Pit Area scraperl 8 250.16 $767, <br />923 <br />092 -Replace Topsoil on Z Pit Area scraperl 8 126.01 ________ <br />_ <br />$386,825 <br />093 -Replace Topsoil on F Pit Area scraperl 8 65.6 $201,441 <br />094 -Replace Topsoil on G Pit Area including K Pit scraperl 8 607.8 $1,866,007 <br />095 -Replace Topsoil on East A Pit Area scraperl 8 110.91 $340,473 <br />_ -Replace Topsoil at West Panel Ponds, BC Roads and Shop scraperl 8 160.2,11 $491,928 <br />-097 -Replace Topsoil at East Panel Ponds and A Road scraperl 8 280.7 $861,739 <br /> <br /> -Seed DIE Pit Range A-B revege 1 273.3 $227,452 <br />101 - - eed F Pit Range A-B revege 1 55.8 $46,439 <br />102 -Seed Z Pit Range A-B revege 1 190.2 $158,292 <br />103 -Seed G Pit Range A-B revege 1 600.5 $499,836 <br />104 -Seed Ash Dump Range A- revege 1 223.9 $186,339 <br />105 -Seed East A Pit Range A-B revege 1 130.3 $108,441 <br />106 -Seed A Pit Range C-B revege 1 268.3 $197,438 <br /> <br />_10_7 <br />-Seed H Pit <br />revege <br />1 <br />207.1 ----- ---------------- <br />$75,459 <br />_ <br />108 -Seed Ash Dump Range B revegc 1 25.0 $9,109 <br />109 -Seed DIE Pits Range B revege 1. 29.6 $10,785 <br /> <br />120 -Seal 16 Boreholes (MR212) borehole 1 24.0 <br />---- - --------- <br />$11,829 <br /> -Seal 75 Developmental Drill Holes borehole 1 111.0 $55,500 <br />.12.2- -Seal Monitoring Wells borehole 1 74.0 $31, 003 <br />123 -Seal 4 Boreholes (TR-106) borehole 1 6.2 $3,224 <br />---------- <br /> <br />130 <br />-Demolish structures, remove materials and debris <br />demolish <br />1 <br />160.0 -- <br />$ <br />1 <br />;455, <br />7 <br />58 <br />_ <br />-131 -Mobilize and Demobilize from Hayden, CO mobilize 1 4.2 __ <br />_ <br />_ <br />_ <br />$22,594 <br /> <br /> - -------- --------- - <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 4,196.8 $8,665,875