Laserfiche WebLink
TR-53 - Transfer 2,379 Acres from the Bowie No. 1 Mine to the Bowie No. 2 Mine <br />- not called complete <br />- proposed withdrawal date of 3/30/10 <br />- no change in bond liability <br />- no change in disturbed area acreage <br />- resubmitted as Permit Revision No. 4 <br />Permit Revisions <br />PR-4 - Transfer Portion of Permit Area to Bowie No. 2 <br />- completeness date of 6/18/10 <br />- review in progress <br />Succession of Operator <br />SO-5 - Transfer of Permit and Succession of Operator <br />- submitted on 7/6/09 <br />- proposed approval with one stipulation on 7/28/09 <br />- no change in bond liability <br />- no change in disturbed area acreage <br />Bond Release <br />SL-3 - Partial Phase One Bond Release - Structural Demolition at Unit Train Loadout <br />- submitted 6/28 /07 <br />- proposed approval on 2 /2 2 /0 8 <br />- issued on 3/31 /0 8 <br />Stipulations <br />The following are the stipulations that are still active. All other stipulations have been complied with or have <br />been terminated. <br />Stipulation No. 26 <br />One year after the completion of reclamation activities at the loadout, the operator shall compare the soil <br />characteristics of the reclaimed area with the adjacent undisturbed orchard areas to verify that the <br />hydrologic function of flood irrigability has been restored. Such comparison should be in the form of <br />infiltration, permeability and texture studies. <br />Stipulation No. 53 <br />Before mining resumes, BRL will submit, and obtain Division approval for, a revision that <br />addresses the planned mining sequence for the remainder of the existing permit term.