My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-14_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-10-14_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:25:36 PM
Creation date
10/15/2010 1:40:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
10/14/2010
Doc Name
Preliminary Adequacy Review Letter
From
DRMS
To
Colowyo Coal Company, LP
Type & Sequence
TR87
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
case hydrologic condition. Please demonstrate, through SEDCAD modeling, that the <br />Prospect Pond spillway system complies with Rule 4.05.9(2)(c)(ii) for the 25-year 24- <br />hour storm event for the 2017 watershed condition. <br />Colowyo has provided new, proposed generalized stock tank design as Figure 2.05-6. <br />This stock tank design will be used to construct the five stock tanks proposed in the <br />Prospect Watershed of the East Pit. Colowyo also has an approved stock tank design in <br />Exhibit 7, Item 11, which was used to construct all of the stock tanks that are currently on <br />the ground in the East Pit and Section 16 Pit reclamation. Colowyo will need to retain <br />the stock tank design in Exhibit 7, Item 11 as it is still valid for the existing stock <br />tanks. The Division recommends that Colowyo include Figure 2.05-6 in Exhibit 7, <br />Item 11 as well, so all stock tank designs are in the same location. The Division also <br />requests that Colowyo provide a cover page for Figure 2.05-6 as well as a short <br />description stating which stock tanks this design will be used to construct. Finally, <br />as discussed in the 13 October 2010 meeting, Colowyo needs to update Figure 2.05-6 <br />to accurately represent the stock tanks as they will be constructed in the prospect <br />watershed, including the routing of the runoff for stock tanks not constructed <br />directly in the post-mining drainage channels. <br />This concludes the preliminary adequacy review for the Colowyo Mine's Technical Revision 87. <br />Please contact me at (303)866-3567 X8145 if you have any questions or comments. <br />Sincerely, <br />James R. Stark <br />Environmental Protection Specialist <br />cc: Sandy Brown, CDRMS <br />Matt Guptill, Colowyo
The URL can be used to link to this page
Your browser does not support the video tag.