My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-14_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-10-14_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:25:36 PM
Creation date
10/15/2010 1:40:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
10/14/2010
Doc Name
Preliminary Adequacy Review Letter
From
DRMS
To
Colowyo Coal Company, LP
Type & Sequence
TR87
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rule 4.05.4 - Stream Channel Diversions and Stream Channel Reconstruction <br />4. The narrative on revised page Exh.7-14R-3 discusses the use and design of temporary <br />ditches to divert runoff from spoil and reclaimed areas to the unreclaimed East Pit. These <br />temporary ditches result in areas that are excluded from producing runoff in the <br />SEDCAD modeling for the Prospect Pond. The text narrative references Figure Exh.7- <br />14R-7 and states that the ditches are "short term in nature and will be removed as <br />reclamation progresses." Figure Exh.7-14R-7 shows one of the ditches extending a <br />significant distance northeast into previously reclaimed areas. Please explain in more <br />detail in the narrative on revised page Exh.7-14R-3 how and when these ditches will <br />be constructed and used and when each ditch will be removed or reclaimed. <br />Currently approved permit page Exh.7-14D2 (revised 25 July 2006, TR-63) shows the <br />approved design information for the Final East Pit Ditch and the Prospect Ditch <br />permanent channels. Proposed SEDCAD design runs for the 10-year, 24-hour storm <br />event for the Prospect Pond result in new design information for the Final East Pit Ditch <br />and Prospect Ditch that would appear to supersede the currently approved information on <br />page Exh.7-14D2. Please review the designs for the Final East Pit Ditch and the <br />Prospect Ditch and submit new permanent channel design information that is <br />consistent with the SEDCAD modeling submitted with Technical Revision 87 for <br />these two ditches. <br />6. Based on the backfilling and grading schedule (Map 29), Colowyo will be constructing <br />portions of their permanent, post-mining drainage channels over several reclamation <br />seasons. In order to ensure that the yearly channel construction has been completed as <br />designed, the Division has requested that Colowyo provide a yearly as-built certification <br />of all ditch segments constructed during a reclamation season. The Division has <br />requested that this information be included in the Annual Reclamation Report. Please <br />revise the text in Permit Section 4.05.4 and in the introductory text to Exhibit 7, <br />Item 14 committing to providing the Division with yearly as-built certifications for <br />all post-mining drainage channels constructed in a reclamation season in the Annual <br />Reclamation Report for that year's reclamation. The as-built certification will, at a <br />minimum, detail the construction of each channel segment (Width, depth, riprap <br />D50, etc.) and, provide a map or drawing of each channel segment, reference the <br />exhibit that was used to determine design requirements for the channel segment and <br />provide representative pictures of each channel segment constructed. <br />Rule 4.05.9 - Impoundments <br />7. Colowyo has provided revised page Exh.7-14R-1, which describes the five proposed <br />stock tanks in the Prospect watershed area of the East Pit. The text in the third paragraph <br />of revised page Exh.7-14-R1 does not accurately describe the proposed stock tanks either <br />by name and/or by year of construction when compared to Map 12 and the figures <br />contained in the SEDCAD modeling. This deficiency was identified and discussed <br />during both the 18 August 2010 meeting at the Mine and the 13 October 2010 meeting at <br />the Division's office. Please review the stock tank information provided on revised <br />page Exh.7-14R-1, Map 12 and the SEDCAD modeling and correct this information <br />as necessary. <br />8. Colowyo has provided revised page Exh.7-14R-2, which describes the Prospect <br />watershed condition in three future years, with the 2017 condition identified as the worst
The URL can be used to link to this page
Your browser does not support the video tag.