My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-07-02_PERMIT FILE - M2002004
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2002004
>
2002-07-02_PERMIT FILE - M2002004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 2:18:41 PM
Creation date
10/15/2010 10:37:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
PERMIT FILE
Doc Date
7/2/2002
Doc Name
Constr Material Regular 112 Operations Permit Application
From
Rio Grande Portland Cement Corp
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. . <br />Memo to PCPC. <br />Re: SUP No 199.9-002. . <br />September 13, 10,99 <br />`Page 16 - <br />The Department's memorandum of June 9,'1999, recommends the applicant be <br />required to do the following prefe.rabiy prior to approval of the special use permit and <br />Certainly before commencing operation of the fa.gilities: <br />1. Submit to the Department of Public Works detailed constructicn'plans <br />prepared by a licensed engineer, which cover the necessary road '. <br />improvements to bring the section of Lime Road from 1-25 east to the <br />entrance.into the site, that will result in the road meeting minimum design <br />standards for a`minor collector road, rural cross section. The plans shall <br />be prepared in accordance with the requirements of the Pueblo County <br />Roadway Design and Construction Standards. If the access point lies <br />east of the railroad crossing on Lime Road, the plans shall also include <br />proposed improvements to the rail crossing on Lime Road, including but <br />not limited to improved horizontal and vertical alignment and sight <br />distance, installation of cross arms and signals. <br />Submit to the Department of Public Works a detailed engineer's cost <br />estimate for the improvements depicted in the final (approved by the <br />Department of Public Works) construction plans, including improvements, =- . <br />if any, associated with the railroad crossing. <br />3. Enter into an agreement with the Pueblo County Board of County <br />Commissioners identifying the portion. of the cost of the road <br />improvements to be borne by the applicant and providing suitable means <br />of guaranteeing that participation, such as a letter of credit; escrowed <br />funds, etc., and which further defines the time frame for completion of all. <br />improvements. <br />Comments from the Colorado Department of Transpcrtation (00OT),dated March 11, <br />1999, are attached as Exhibit 1.6. CDOT indicates the portion of lands west of I-25, <br />which are part of the westerly block of lands, _will not be granted. access to the <br />interstate. 'Additionally, drainage from the project to the State highway right. of shall not <br />exceed the undeveloped, historical flow. <br />The applicant submitted an Analysis of Projected Traffic; dated May 31, 1999, and <br />received by the Department of.Planning and Development on June 1, 1999. The <br />Analysis indicates plant access will be from Lime Road east of Interstate 25. The plant <br />access (private) road will connect with Lime Road `approximately Y2 mile west of where <br />the UP and BNSF rail lines cross Lime Road (currently, this access point is immediately <br />adjacent to the tracks at the rail crossing and originally the access was proposed to, be
The URL can be used to link to this page
Your browser does not support the video tag.