My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-08_REVISION - M1986079
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986079
>
2010-10-08_REVISION - M1986079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:42:01 PM
Creation date
10/12/2010 12:16:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986079
IBM Index Class Name
REVISION
Doc Date
10/8/2010
Doc Name
Surety Reduction Approval
From
DRMS
To
Lafarge Noth America
Type & Sequence
SR3
Email Name
DB2
MR1
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/houdunit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Light Duty Pickup, 04, 314 T. $36.21 1 $36.21 $36.21 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $36.21 $36.21 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Brighton <br />Transportation Cycle Time : Non- Total one-way travel distance : 6.0 miles <br /> Roadable Roadable Average travel speed : 25.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.24 0.24 Total non-roadable mob/demob cost $860.62 <br />Return time (hours) = 0.24 0.24 * two round trips with haul rig <br />Loading time (hours) = 1.00 NA Total roadable mob/demob cost ** : $17.38 <br />Unloading time (hours) = 1.00 NA ** one round trip, no haul rig <br />Subtotals = 2.48 0.48 <br />JOB TIME AND COST Total job time : 4.96 hours <br />Total job cost : $878
The URL can be used to link to this page
Your browser does not support the video tag.