Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : DRMS <br />Task #: MOB State : Colorado Permit/job #:M-1986-079 Date : 1010712010 County:Adams Abbreviation :none _ <br />User : DB2 Site :M&G Poly Mann Filename :M079-MOB <br />Permit or other job action : Surety Reduction Request Sr-3 <br />Task description : Mobe / Demobe <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 1007) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour. $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat 320C 21.71 $26.97 $88.67 1 $115.64 $88.67 $150.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $115.64 $88.67 $150.00