My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-12_REVISION - M1994108
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994108
>
2010-10-12_REVISION - M1994108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:25:20 PM
Creation date
10/12/2010 9:56:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994108
IBM Index Class Name
REVISION
Doc Date
10/12/2010
Doc Name
Cost Summary Form AM-01
From
DRMS
To
Noland Inc
Type & Sequence
AM1
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 2 of 2 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Cortez <br />Transportation Cycle Time : Non- Total one-way travel distance : 18.0 miles <br /> Roadable Roadable Average travel speed : 40.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.45 0.45 Total non-roadable mob/demob cost' : $5,381.82 <br />Return time (hours) = 0.45 0.45 * two round trips with haul rig <br />Loading time (hours) = 1.00 NA Total roadable mob/demob cost ** : $0.00 <br />Unloading time (hours) = 1.00 NA *• one round trip, no haul rig <br />Subtotals = 2.90 0.90 <br />JOB TIME AND COST Total job time : 5.80 hours <br /> Total job cost : $5,382 <br />ROADABLE EQUIPMENT
The URL can be used to link to this page
Your browser does not support the video tag.