My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-12_REVISION - M1994108
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994108
>
2010-10-12_REVISION - M1994108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:25:20 PM
Creation date
10/12/2010 9:56:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994108
IBM Index Class Name
REVISION
Doc Date
10/12/2010
Doc Name
Cost Summary Form AM-01
From
DRMS
To
Noland Inc
Type & Sequence
AM1
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Task # : 007 State : Colorado Permit/job #:M-1994-108 <br />Date : 0912212010 County :Montezuma Abbreviation :none <br />User : KAP Site : Cedar Point Filename : M108-007 <br />sheet 1 of 2 <br />Permit or other job action :Amendment <br />Task description :Mobilize/Demobilize <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series 11 - 8U (200 53.17 $46.56 $125.45 2 $344.02 $250.90 $0.00 <br />-Cat 633E Series 2 (2001) 56.34 $80.67 $125.45 2 $412.23 $250.90 $0.00 <br />-Revegetation Equipment 10.00 $20.00 $88.67 1 $108.67 $88.67 $0.00 <br />-Reveg failure 10.00 $20.00 $88.67 1 $108.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $973.59 $679.14 $0.00
The URL can be used to link to this page
Your browser does not support the video tag.