My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-08_PERMIT FILE - M1977223
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1977223
>
2010-10-08_PERMIT FILE - M1977223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:22:48 PM
Creation date
10/12/2010 6:57:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977223
IBM Index Class Name
PERMIT FILE
Doc Date
10/8/2010
Doc Name
Adequacy Review Response - AM01
From
L J Development, Inc
To
DRMS
Type & Sequence
AM1
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
There would be more than enough soil for this function. The existing mine has had <br />approximately 145,200 loose cubic yards removed to date and the project surrounds the <br />existing pit. The division and the applicant agree on the total cubic yards 770,701 to <br />701,777 to backfill the pit to pre-existing ground level. However that would not be <br />necessary due to the facts that the excavation would already be at the required slope of 4 <br />horizontal to 1 vertical and no ground water would be seeping into the excavated hole. <br />The amount of material to justify the applicants interpretation is 362,640 loose cubic yards <br />which is less than 2% different than the recalculated amount of 369,624 loose cubic yards, <br />the applicant will use the higher number for the cost calculation in Exhibit "L". <br />5. The Applicant has stated material will not be imported for backfilling. In the event the <br />Division has to reclaim the site, where will the material for backfilling the reservoir come <br />from? This information is required to calculate the financial warranty amount. <br />No material will be imported for backfilling. This permit site has more than enough <br />material that can be borrowed from the affected area to backfill this reclamation plan. <br />Please see the drawings and calculations for the methodology enclosed with this adequacy <br />reply. <br />INCLUDED HERE IS A REVISED EXHIBIT "L" RECLAMATION COST <br />REFLECTING THE INCREASED COST OF MOVING THE EXTRA MATERIAL. <br />RUE 6A.11 EXI-IBIT' L' <br />REVISED OCTOBER 7, 2010 <br />RECLAMATION COST <br />WILEY PIT EXTENDED <br /> QTY. UNIT UNIT COST COST NOTES <br />1.) REVEGETATION SEEDING & PREP. 165.85 AC $225.00 $37,316 3%-S% broadcast seeding <br />Ia.) BROADCAST SEEDING 8.75 AC $150.00 $3,938 DOUBLE THE COST FOR BROADCAST SEEDING <br />lb.) ESTIMATED FAILURE RATE 40% 66.34 AC $225.00 $14,927 REVISED JULY 2010 <br />2.) CHISEL (RIP) STOCKPILEIPROCESS AREA 35 AC $120.00 $4,200 <br />3.) PERFORATE PIT FLOOR 9.6 AC $500.00 $1,800 <br />4.1 34CKfPLL' RESERVOIR (LESS 7EM 9.0 EX.4167 k'} 369623 LCY $1.70 $309,024 WORK DONE WITH SCRAPERS REVISED OCT. 7, 2010 <br />5) DEMO CONCRETE CHANNELS 807 LF $15.00 #12,105 <br />6.) DEMO CONCRETE SAND TRAP & SPILLWAYS 1 LS $6,404.00 $6,404 <br />7.) DEMO INFILTRATION GALLERY 1 LS $21,500.00 $21,600 <br />8.) DEMO PARSHALL FLUME I IS $2,260.00 $2,260 <br />9.) TOPSOIL STOCKPILED & REPLACED ADEQUACY ITEM 91960 LCY $0.85 $78,166 EXCAVATED AND REPLACED w/SCRPAERS <br />10.) MULCH 174.6 AC $25.00 $4,365 <br />11.) WEED CONTROL 174.6 AC $8.50 $1,484 <br />12.) MOWDEMOB CAT OBN i LS $350.00 $350 <br />13.) MOBILIIATION & DEMOBILIZATION ALL 1 LS $250.00 $250 <br />OTHER IMPLMENTS & TRACTORS <br />TOTAL DIRECT COST <br />INDIRECT COST <br />PUBLIC LIABILITY INSURANCE <br />CONTRACTOR PERFORMANCE BOND <br />CONTRACTOR PROFIT <br />DRMS ADMIN. EXPENSE <br />ADDITIONAL SUPERV. <br />ENGINEERING WORK <br />OMG ADMIN. FEES <br />CONTINGENCY <br />TOTAL BOND AMOUNT <br />$561,788 <br />1.55% $8,708 <br />1.55% $8,708 <br />10.00% $56,179 <br />5.00% $28,089 <br />4.00% $22,472 <br />5.00% $28,089 <br />5.00% 528,089 <br />2.00% $11,236 <br />$753,358 <br />SCOOPE OF WOIIKAND SEQUENCE <br />4
The URL can be used to link to this page
Your browser does not support the video tag.