My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-05_PERMIT FILE - M2010054
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2010054
>
2010-10-05_PERMIT FILE - M2010054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:25:23 PM
Creation date
10/5/2010 1:23:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010054
IBM Index Class Name
PERMIT FILE
Doc Date
10/5/2010
Doc Name
Completeness Review Response
From
LJ Development, Inc.
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17. The NRCS recommends that the operator use 2000 lbs of weed free grass hay or straw, <br />crimped 1-2". This is what the operator will do to establish the native grass. <br />18. SEE BELOW FOR THE RECLAMATION ESTIMATE: <br />WILLIAMS PIT #1 <br />RECLAMATION COSTS <br />PROPOSED TO THE MLRB <br /> TOTAL TOTAL <br />Item COST/UNIT UNITS COST <br />1. Grass seed mix 163.25AC 9.90 1616.18 <br />2. Drilling grass seed 41.OOAC 9.90 405.90 <br />3. Fertilizer (40#/A N&P) 35.OOAC 9.90 346.50 <br />4. Fertilizer application 15.OOAC 9.90 148.50 <br />5. Topsoiling w/dozer or loader. 0.00 <br />Maximum push 250', (07"/Avg) 0.75 LCY 9,263.00 6947.25 <br />6. Replacing Overburden (4" /Avg) 0.65 LCY 5,271.00 3426.15 <br />7. Disking or Scarifying 12.50 AC 9.90 123.75 <br />8. Weed Control 20.00 AC 9.90 198.00 <br />9. 2,000#/A grass, hay or straw mulch 75.OOAC 9.90 742.50 <br />10. Spread & crimp mulch 18.OOAC 9.90 178.20 <br />11. Backsloping (mined to slope) 2.OOAC 0.00 0.00 <br />12. Mobilization Cost (Lump Sum) 1.00 LS 750.00 750.00 <br />Total Direct Reclamation Cost 14882.93 <br />Indirect Cost <br />Contractor Overhead & Profit <br />Public Liability Insurance 1.55% 230.69 <br />Contractor Performance Bond 1.55% 230.69 <br />Contractor Profit 10.00% 1488.29 <br />DMG Project Administrative Expenses <br />Minerals Program Administration Fee 5.00% 744.15 <br />Total Performance Bond Amount $17,576.73
The URL can be used to link to this page
Your browser does not support the video tag.