My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-04_REVISION - M1983159
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983159
>
2010-10-04_REVISION - M1983159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:25:19 PM
Creation date
10/5/2010 12:25:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983159
IBM Index Class Name
REVISION
Doc Date
10/4/2010
Doc Name
Surety Increase Notice SI-01
From
S & S Aggregate, Inc.
To
DRMS
Type & Sequence
SI1
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN MIGUEL POWER ASSOCIATION <br />A Touchstone Energy' Cooperative ?0)[ <br />September 8, 2010 <br />Dear Member: <br />Tri-State Generation and Transmission Cooperative (San Miguel's power <br />supplier) is progressing with the new 115kV transmission line. This line improves <br />the transmission system feeding SMPA members, providing a stronger source <br />during peak times, and better reliability through a stronger alternate feed. <br />Great Southwestern (Tri-State's contractor) is nearing completion of the Nucla to <br />Norwood section of the project, which will allow us to take out the old 69kV <br />transmission line. To remove the poles and wire, crews will be accessing your <br />and/or neighboring properties. Representatives from Great Southwest will make <br />reasonable attempts to contact owners prior to entering the properties, and will <br />coordinate to minimize disrupting your operations (ie, watering, cutting, livestock, <br />etc). <br />Some transmission poles have other San Miguel, phone or member wires <br />attached - these will have only the top portion of the pole removed, leaving the <br />lower portion of the pole supporting the remaining wires. <br />If you have any_questions, please call: <br />Terry Daley <br />System Engineer <br />San Miguel Power Association <br />1-800-864-7256 x-203 <br />We apologize for any inconvenience this may cause, and appreciate your <br />understanding. We expect this work to take place in late September to early <br />October: Please note that weather or other factors may delay the actual removal <br />schedule. <br />Headquarters <br />81424 Box 1150, Ridgway, Colorado 81432 <br />Box 817, Nucla, Colorado <br />970-626-5549 <br />970.864.7311.970-864.7257 Fax . 970.626.5688 Fax
The URL can be used to link to this page
Your browser does not support the video tag.