Laserfiche WebLink
Support Facilities <br />Facility renovation, mainly associated with the portal area, the breaker building, the prep <br />plant, and the power facilities are the primary activities in the surface facility area. Materials <br />are presently stored in the western portion of the clean coal stockpile area. Once coal is <br />brought to the surface, NECC will likely require a larger and more permanent material <br />storage area. Considering that one single large area is likely not available for use, NECC <br />may need to consider permitting a number of smaller areas where truck access is available. <br />5