My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-22_INSPECTION - M1977443
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977443
>
2010-09-22_INSPECTION - M1977443
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:23:17 PM
Creation date
9/29/2010 10:28:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977443
IBM Index Class Name
INSPECTION
Doc Date
9/22/2010
Doc Name
Inspection Report
From
DRMS
To
Hardrock Sand and Gravel
Inspection Date
9/14/2010
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 01a State : Colorado Permit/job# : M-1977-443 <br />Date : 0912212010 County :Moffat Abbreviation :none <br />User: DMC Site :Moon Pit No. 2 Filename :M443-01a <br />Agency or organization name: DRMS <br />Permit or other job action :110c SDG <br />Task description : Highwall Reduction <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D7R DS Series 11 - 7SU Horsepower : 240 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2 :NA <br /> Data source: (CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $40.93 NA <br /> Operating cost/hour : $49.75 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $129.22 Total fl eet cost/hour : $129.22 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 8,333 L CY factor : NA volume : 8,333 LCY <br /> <br />Source of estimated volume :Attached <br />Source of estimated swell factor :.5 <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,022.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.60 (Cat HB) <br />Average push gradient : 30.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,375 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.65 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 661.92 LCY/hr <br /> Adjusted fleet production : 661.92 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 12.59 Hours <br />Unit cost : $0.195 /LCY Total job cost : $1,627 <br />
The URL can be used to link to this page
Your browser does not support the video tag.