My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-22_INSPECTION - M1977443
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977443
>
2010-09-22_INSPECTION - M1977443
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:23:17 PM
Creation date
9/29/2010 10:28:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977443
IBM Index Class Name
INSPECTION
Doc Date
9/22/2010
Doc Name
Inspection Report
From
DRMS
To
Hardrock Sand and Gravel
Inspection Date
9/14/2010
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 22-Sep-2010 Permit or job no. M-1977-443 Site :Moon Pit No. 2 <br />User: DMC Abbreviation : none State : Colorado _ <br />Filename : M443-000 County : Moffat <br />Agency or organization name : DRMS <br />Permit or job action :110c SDG <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />01a -Highwall reduction dozer 1 12.5 _ $1,627 <br />02a -Replace topsoil dozer 1 23.6 $3,060 <br />03a -Revegetate disturbed area revege 1 40.0 $4,903 <br />04a -Mobilize reclamation crew/equipment mobilize 1 3.3 _ $859 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 79,6 $10,449 <br />* includes inflation factor adjustment of : NA % TOTAL DIRECT COST * =L $10,449 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $211 <br />Performance bond <br />Job superintendent <br />Profit <br />% of direct total = $110 <br />NA NA total = _NA <br />% of direct total= $1,045 <br />* not required (or eqp. operator serves as super.) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - <br />Financial warranty processing (legal/related costs) <br />Engineering work and/or contract/bid preparation <br />Reclamation management and/or administration <br />TOTAL O & P = $1,366 <br />CONTRACT AMOUNT (direct + O & P) = $11,815 <br />total $ NA total = $0 <br />NA NA total = NA <br />% of cntr. NA total = $591 <br />CONTINGENCY - <br />1.05 <br />NA" <br />10.00 <br />0.00 <br />NA <br />5.00 <br />NA - <br />NA <br />total = NA <br />* contingencies accounted for at task level TOTAL INDIRECT COST = $1,956 <br />TOTAL BOND AMOUNT (direct + indirect) _ $12,405
The URL can be used to link to this page
Your browser does not support the video tag.