Laserfiche WebLink
At the end of the mining process, there shall remain undisturbed soil for <br />up to 10 house pads for future development. These pads shall be located in the upper <br />benches of the mined area. A majority of these pads will be located on the North side of <br />the permit area, south of die Basin Ditch. The location of these pads in each phase will <br />occur prior to the starting of that phase. A lake in the bottom of the floor may be alined <br />for future development (bottom of lake at no time shall penetrate existing ground water <br />conditions).